MEC02-02008
| Final | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 13:09:01. Contact: ###-####. gas failed..42.00 fee 7/25/2002 9:39:20 AM
|
MEC02-01619
| Final | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-03496
| Final | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | FAIL |
|
|
fn randy ###-#### losing air out of range grill 7/25/2002 1:14:14 PM
|
MEC02-01775
| Rough-in | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | FAIL |
|
|
meet dean at 8:30 ###-#### posted corrections...talked to dean..42.00 fee 7/25/2002 9:08:39 AM
|
MEC02-01789
| Final | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 15:41:49. Contact: ###-####.
|
MEC02-00220
| Pressure Test | 7/25/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | P | NR |
|
|
; Phone #: ###-#### frank will meet me with plans 7/25/2002 2:38:58 PM
|
MEC02-01998
| Final | 7/25/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 09:42:47. Contact: ###-####.
|
MEC02-01331
| Rough-in | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 15:14:18. Contact: ###-####.
|
MEC02-01331
| Final | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 15:14:41. Contact: ###-####.
|
MEC02-01665
| Rough-in | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 14:42:29. Contact: ###-####. PARTIAL IN AREA 4 FOR COVER part 4 ok 7/25/2002 7:28:54 PM
|