FIR02-00213
| INSP-Alarm Testing | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | PASS |
|
|
fire alarm finaled 7/25/2002 8:16:38 AM
|
BLD99-00444
| FIRE-Final Inspection | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | PASS |
|
|
fire life/safety finaled. structural inspector to verify the thumbturn has been removed from the rear door 7/25/2002 10:38:42 AM
|
FIR02-00217
| INSP-Supply line flush | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | PASS |
|
|
flush of underground OK 7/25/2002 9:08:41 AM
|
FIR02-00217
| INSP-Sprinkler Rough-in/Hydro | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | PASS |
|
|
hydro test for the underground, fdc, riser header and the overhead system east area OK 7/25/2002 1:18:48 PM
|
FIR00-00653
| INSP-Final Inspection | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | A | FAIL |
|
|
Provide 19.5 ah batteries for panel, provide verification power supply will support the batteries, provide calculations of 14 awg wire for the notification circuit, provide verification that the HVAC units meet requirements of UMC 608 for not having duct smoke detectors 7/25/2002 9:40:50 AM
|
FIR02-00278
| INSP-Final Inspection | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | P | CANC |
|
|
cancelled by the contractor 7/25/2002 10:54:23 AM
|
BLD02-00687
| FIRE-Final Inspection | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | P | PASS |
|
|
fire life/safety finaled 7/25/2002 4:23:55 PM
|
BLD02-00757
| FIRE-Final Inspection | 7/24/2002 | 7/25/2002 | 7/25/2002 12:00:00 AM | P | PASS |
|
|
fire life/safety finaled 7/25/2002 4:24:07 PM
|