BLD03-00818
| BLD-Energy code compliance | 7/24/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | A | FAIL |
|
|
###-#### troy. need to add a stud under floor joist in kitchen next to kitchen ranged vent as top plate that has been cut out. contractor on site notified. 7/25/2003 12:00:52 PM
|
BLD03-00818
| BLD-Framing/Rough-in | 7/24/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | A | FAIL |
|
|
###-#### troy
|
BLD03-00835
| BLD-Final | 7/24/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | A | NR |
|
|
kurt; Phone #: ###-#### Internet Inspection Request from: Annette Moore. needs plumbing 1st. left red stiker. 7/25/2003 11:51:02 AM
|
BLD03-01730
| BLD-Footing | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 1:27:46 AM. Contact: ###-####. No plans on site, footing over dug with gravel fill ?, footing is not continous?.no provision for insulation?. talked with contractor on phone told him no plans do not pour. could not leave any c/n based on no plans not ready. 7/25/2003 10:55:45 AM
|
BLD03-01622
| BLD-Foundation | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 6:12:47 AM. Contact: ###-####.wip. 7/25/2003 10:58:04 AM
|
MEC03-01300
| Conference | 7/24/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | A | PART |
|
|
Ok plan check comments indicate fire dampers in basement, also plumbers are runing condensate line drain. 7/25/2003 10:14:41 AM
|
MEC03-01965
| Rough-in | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 9:07:59 AM. Contact: ###-####.
|
BLD02-03053
| BLD-Final | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 11:14:25 AM. Contact: ###-####.Went to job card does not have all required signatures. 7/25/2003 3:27:21 PM
|
MEC03-01732
| Conference | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | P | DONE |
|
|
I talked with Frank and he wanted to know if some one had inspected this job there is an entry made by me, but is a mistake as I have not been to the job, Frank will recall this back in for another inspection as it has not been inspected by any one from our office as indicated above entry by mistake. 7/25/2003 2:28:02 PM
|
BLD03-00523
| BLD-Conference | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | P | CANC |
|
|
wrong permit number 7/25/2003 2:30:41 PM
|
BLD03-00528
| BLD-Conference | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | P | DONE |
|
|
|
BLD03-01334
| BLD-Conference | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 8:15:52 AM. Contact: ###-####. ceiling insulation paper needs to be protected. 7/25/2003 4:45:46 PM
|
BLD02-02155
| BLD-Framing/Rough-in | 7/25/2003 | 7/25/2003 | 7/25/2003 12:00:00 AM | P | FAIL |
|
|
tait; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Plan check notes indicate to provide addnl information to the field inspector, I have a call into my suppervisor George Slane . As these items all pertain to accessability issues and there are no details on the plans at all. And we do not perform on site plan reveiws for these items. also called contractor about the above.7/25/2003 5:05:41 PM 7/25/2003 5:06:07 PM
|