FIR06-00182
| INSP-Final Inspection | 7/24/2006 | 7/25/2006 | 7/26/2006 7:28:22 AM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR06-00272
| INSP-Final Inspection | 7/24/2006 | 7/25/2006 | 7/25/2006 1:28:41 PM | A | FAIL |
|
|
Descriptors for pull stations do not match point descriptions on the plan, AC power loss is incorrectly identified as NAC trouble, the duct detectors activate a general alarm condition. Need to provide list of signals recieved by remote monitoring of test activity today at next inspection. Notification devices tested okay.
|
FIR06-00406
| INSP-Sprinkler Rough-in/Hydro | 7/24/2006 | 7/25/2006 | 7/25/2006 1:23:35 PM | A | PART |
|
|
Overhead rough-in is acceptable for cover at the drop ceiling areas, noted DP in the cooler is not installed at this time. Also noted 200 degree heads are installed throughout the entire TI space where only ordinary temp. heads are required per NFPA 13 8.3.2.
|
MIS06-00186
| FIR-Final | 7/25/2006 | 7/25/2006 | 7/25/2006 1:20:55 PM | P | PASS |
|
|
Fire life safety is satisfactory, field inspection passed. Noted to contact person the building fire extinguishers are due for annual certification next month.
|
FIR06-00480
| INSP-Sprinkler Rough-in/Hydro | 7/24/2006 | 7/25/2006 | 7/25/2006 10:14:37 AM | A | FAIL |
|
|
Approved plans are not available on site for review as a condition of the permit and requirement for field inspection.
|