BLD07-00529
| FIRE-Final Inspection | 7/25/2007 | 7/25/2007 | 7/27/2007 5:10:03 PM | P | PASS |
|
|
Fire life safety passed inspection.
|
BLD07-00531
| FIRE-Final Inspection | 7/25/2007 | 7/25/2007 | 7/27/2007 1:50:13 PM | P | PASS |
|
|
Fire life safety is satisfactory, inspection passed.
|
BLD07-01644
| FIRE-Conference | 7/24/2007 | 7/25/2007 | 7/27/2007 1:41:58 PM | A | DONE |
|
|
On site visit to discuss project related fire alarm and sprinkler permit issues.
|
FIR07-00106
| INSP-Conference | 7/24/2007 | 7/25/2007 | 7/25/2007 4:35:37 PM | P | PART |
|
|
Completed pump acceptance testing per NFPA 20, noted some items in need of correction including mesh at PRV and engine exhaust discharge, FDC needs repair, lock fuel supply open, no galvanized pipe is allowed in the fuel supply line, pump room needs adequate ventilation and a floor drain, provide 3-way valve at jockey sensing guage, tighten bolts at flex exhaust flange, program weekly run timer, the pressure limiting device solenoid is not functioning properly. Pump curve data meets requirements.
|
FIR07-00540
| INSP-Final Inspection | 7/25/2007 | 7/25/2007 | 7/25/2007 4:29:02 PM | P | PART |
|
|
Final pending as-built plans for field modifications, also need to test door holder interconnections when completed, provide updated map at the panel.
|
FIR07-00554
| INSP-Final Inspection | 7/24/2007 | 7/25/2007 | 7/25/2007 1:36:19 PM | P | CANC |
|
|
No time available to complete this inspection today.
|
BLD07-01475
| FIRE-Final Inspection | 7/23/2007 | 7/25/2007 | 7/25/2007 1:35:25 PM | A | NR |
|
|
Need project related fire sprinkler permit final prior to life safety final.
|
FIR07-00502
| INSP-Sprinkler Rough-in | 7/24/2007 | 7/25/2007 | 7/25/2007 1:04:30 PM | A | PART |
|
|
UG fire supply line installation is good for cover.
|
FIR07-00220
| INSP-Sprinkler Rough-in | 7/24/2007 | 7/25/2007 | 7/25/2007 12:40:18 PM | A | PART |
|
|
Rough-in is approved for cover, final pending ceilng tile and escutcheons.
|
FIR07-00520
| INSP-Sprinkler Rough-in | 7/24/2007 | 7/25/2007 | 7/25/2007 12:38:58 PM | A | PART |
|
|
Okay for cover at the drop ceilings, noted one hanger that has been removed to be re-installed.
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 7/24/2007 | 7/25/2007 | 7/25/2007 12:02:02 PM | A | PART |
|
|
OH hydrostatic test for the 5th floor SW quad passed.
|
FIR07-00573
| INSP-Final Inspection | 7/19/2007 | 7/25/2007 | 7/25/2007 11:34:46 AM | P | CANC |
|
|
dave Phone #: ###-#### Inspection cancelled from web by: Victoria Apatang
|
FIR07-00038
| FIR-Aging Inspection | 7/25/2007 | 7/25/2007 | 7/25/2007 11:23:10 AM | | DEFR |
|
|
Work in progress
|
FIR07-00244
| INSP-Final Inspection | 7/23/2007 | 7/25/2007 | 7/25/2007 11:21:47 AM | A | NR |
|
|
Need shell and core project final prior to tenant permit final request.
|
FIR06-00704
| INSP-Final Inspection | 7/23/2007 | 7/25/2007 | 7/25/2007 11:20:25 AM | A | CANC |
|
|
No time available to complete inspection.
|
BLD06-00688
| FIRE-Final Inspection | 7/20/2007 | 7/25/2007 | 7/25/2007 11:19:44 AM | A | CANC |
|
|
No time available to complete inspection.
|
FIR07-00280
| INSP-Sprinkler Rough-in/Hydro | 7/25/2007 | 7/25/2007 | 7/25/2007 11:16:18 AM | A | PART |
|
|
Preaction system passed 24 hr. air test.
|
FIR07-00545
| INSP-Sprinkler Rough-in | 7/24/2007 | 7/25/2007 | 7/25/2007 11:15:08 AM | A | PART |
|
|
OH rough-in is approved for cover at the drop ceilings.
|
FIR07-00556
| INSP-Final Inspection | 7/23/2007 | 7/25/2007 | 7/25/2007 11:13:55 AM | A | PASS |
|
|
Fire alarm work passed field inspection, permit finaled.
|
FIR07-00203
| INSP-Final Inspection | 7/18/2007 | 7/25/2007 | 7/18/2007 9:42:17 AM | A | CANC |
|
|
PUMP TEST. PLEASE CALL JEFF PACKHAM IF THERE ARE QUESTIONS. Phone #: ###-#### Internet Inspection Request from: Jeff Packham Inspection cancelled from web by: Jeff Packham
|