ESC06-01149
| BMP Violation | 7/25/2007 | 7/25/2007 | 7/25/2007 3:33:03 PM | P | PART |
|
|
Correction to owner: Bare ground exceeding 30 days on site. Needs to stablize if further work has not started in 2 weeks. Signage needed. Will follow up.
|
ESC07-00619
| BMP Violation | 7/25/2007 | 7/25/2007 | 7/25/2007 2:31:26 PM | P | FAIL |
|
|
Written correction posted on west side of new mod building. Complete all items by the end of the day on 7-26-07 or a stop work order will be issued on Friday morning at the re-inspection; 7-27-07.
|
ESC06-01643
| Conference | 7/24/2007 | 7/25/2007 | 7/25/2007 12:26:56 PM | A | DONE |
|
|
At 10:30 a.m: Met with project RP, issued written correction notice with permit general conditions. C/Notice included time frame for compliance or further enforcement will occur. Re-posted 2nd stop work order, first one was removed over our request to not. Electrical work was performed over stop work. Informed contractor/RP both of these offenses are grounds for issuance of a citation. Also on site was Code Enforcement (M. Garner), B. Archabald and Terry Records as well as the RP, (B. Davis).
|