Inspections for the day of: Friday, July 25, 2008.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00202 Random Inspection7/25/20087/25/20087/25/2008 4:01:31 PMPFAIL
Will be moving there entrance to the west end of project due to activity cutting through the one aready.
CAS
ESC08-00367 BMP Violation7/21/20087/25/20087/25/2008 3:29:04 PMPFAIL
Need to clean sediment out of gutter pan and maintain D.I.
CAS
ESC08-00401 BMP Violation7/25/20087/25/20087/25/2008 3:04:09 PMPFAIL
Notice of Correction.
1. Protect D.I. at the end of street.
2. Clean up ALL sediment of all hard surface.
Failure to comply will result in a stop work order. Will re-inspect on 7/28/08
CAS
#460
ESC08-00196 BMP Violation7/25/20087/25/20087/25/2008 3:03:01 PMPFAIL
Notice of Correction.
1. Protect D.I. at the end of street.
2. Clean up ALL sediment of all hard surface.
3. Install sediment control bmps on lot where slope is greater than 2%.
Failure to comply will result in a stop work order. Will rre-inspect on 7/28/08
CAS
#460
ESC07-01125 Site Preparation7/25/20087/25/20087/25/2008 2:19:38 PMAPASS
Site looks good.
CAS
ESC07-01206 Site Final7/25/20087/25/20087/25/2008 1:51:31 PMPPASS
All work is complete. Slopes are stabilized.
CAS
ESC07-01478 Tracking Control7/23/20087/25/20087/25/2008 1:47:08 PMPPASS
ESC08-00364 Site Preparation7/25/20087/25/20087/25/2008 1:33:47 PMPPASS
All work is ineterior T.I.. No issues present.
CAS
ESC08-00556 Site Preparation7/25/20087/25/20087/25/2008 11:41:59 AMAPASS
Site looks good. Wattlw is moved due to pump truck but will be put back into place.
Sign posted at front of lot.
CAS
ESC07-01557 General Inspection7/25/20087/25/20087/25/2008 11:39:53 AMPPART
Need to install one peice of wattle at the front of lot. But no activity on project.
CAS
ESC08-00179 Complaint Inspection7/25/20087/25/20087/25/2008 10:52:43 AMAFAIL
Excessive tracking offo f project due to dust surpressing with a water truck. Will be sweeping up. Also told RP to protect the storm drain right outside of the construction entrance.
Will re-inspect on 7/28/08.
CAS
ESC08-00603 Site Preparation7/25/20087/25/20087/25/2008 10:41:25 AMPDEFR
Moved to a general inspection.
ESC08-00603 General Inspection7/25/20087/25/20087/25/2008 10:38:28 AMAPASS
Site looks good. No issues.
CAS
ESC08-00592 General Inspection7/25/20087/25/20087/25/2008 10:09:18 AMAPASS
Work is almost completed. Project does not looks bad. Removed the stop work order sign off of thr telephone post due to the issueing of the ESC permit.
CAS
ESC08-00337 Tracking Control7/23/20087/25/20087/25/2008 10:02:52 AMPPART
Due to the phase a construction entrance cannot be used. They are sweeping up when needed.
CAS
ESC08-00504 BMP Violation7/24/20087/25/20087/25/2008 9:40:44 AMADEFR
Passed on to ACHD. Over storm water violations.
CAS
ESC08-00547 Site Preparation7/25/20087/25/20087/25/2008 8:36:13 AMACANC
ESC08-00336 BMP Violation7/22/20087/25/20087/25/2008 8:35:37 AMPCANC
ESC07-01139 Random Inspection7/25/20087/25/20087/25/2008 8:33:33 AMAPASS
ESC07-01278 Random Inspection7/25/20087/25/20087/25/2008 8:29:35 AMAPASS
Site looks good. Entrance has been re-stabilized.

CAS
ESC08-00084 Tracking Control7/22/20087/25/20087/24/2008 9:08:59 AMPFAIL
Verbal Notice.
Clean up all hard surfaces of sediment and debris. Will re-inspect on 7/28/08.
CAS