FIR11-00285
| INSP-Sprinkler Rough-in | 7/25/2011 | 7/25/2011 | 7/25/2011 3:43:59 PM | P | FAIL |
|
|
Arrived at job site but found that the piping installation of the underground is being delayed due to problems with other services. Troy said he would reschedule for tomorrow.
|
BLD11-01619
| FIRE-Final Inspection | 7/25/2011 | 7/25/2011 | 7/25/2011 2:29:18 PM | P | FAIL |
|
|
Provide current inspection for the fire extinguisher and repair the emergency light.
|
BLD10-01628
| FIRE-Final Inspection | 7/25/2011 | 7/25/2011 | 7/25/2011 1:45:54 PM | P | FAIL |
|
|
Provide a spill kit for the batteries and signage as per the review comments.
|
FIR11-00204
| INSP-Sprinkler Rough-in | 7/22/2011 | 7/25/2011 | 7/25/2011 1:45:11 PM | A | PASS |
|
|
Sprinkler piping can be covered. The branchline tie-ins are not completed but will be verified from the mechanical mezzanine at the final inspection.
|
FIR11-00179
| INSP-Sprinkler Rough-in | 7/22/2011 | 7/25/2011 | 7/25/2011 1:44:46 PM | A | PASS |
|
|
Sprinkler piping can be covered. The branchline tie-ins are not completed but will be verified from the mechanical mezzanine at the final inspection. Also sprinkler coverage will be required under the duct work on the mechanical mezzanine as discussed.
|
FIR11-00272
| INSP-Final Inspection | 7/22/2011 | 7/25/2011 | 7/25/2011 9:01:20 AM | A | PASS |
|
|
permit finaled
|
FIR11-00080
| INSP-Final Inspection | 7/22/2011 | 7/25/2011 | 7/25/2011 9:00:52 AM | A | PASS |
|
|
Permit finaled
|