MEC11-00510
| Final | 7/25/2011 | 7/25/2011 | 7/26/2011 7:55:11 AM | P | PASS |
|
|
talked to greens heating about scheduling a final inspection
|
MEC11-02042
| Final | 7/25/2011 | 7/25/2011 | 7/25/2011 2:44:18 PM | P | PASS |
|
|
|
MEC11-00250
| Final | 7/25/2011 | 7/25/2011 | 7/25/2011 2:11:17 PM | P | FAIL |
|
|
left notice on door
|
MEC11-00845
| Final | 7/25/2011 | 7/25/2011 | 7/25/2011 1:55:14 PM | P | PASS |
|
|
meet at 1:30pm with matt
|
MEC11-00274
| Mec-Aging Inspection | 7/25/2011 | 7/25/2011 | 7/25/2011 11:01:20 AM | | PEND |
|
|
left notice on door
|
MEC11-02242
| Final | 7/22/2011 | 7/25/2011 | 7/25/2011 10:46:52 AM | A | PASS |
|
|
Please do a final inspection contact homeowner Nan Bristol at phone number above Phone #: ###-#### >> Inspection requested via web by Alana Lane left message
|
MEC11-02157
| Rough-in | 7/23/2011 | 7/25/2011 | 7/25/2011 10:11:15 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Mike Almanza
|
MEC11-02204
| Pressure Test | 7/22/2011 | 7/25/2011 | 7/25/2011 10:11:00 AM | A | PASS |
|
|
Building Energy will perform the duct blast test on 7/25/11 at 10 am. Phone #: ###-#### >> Inspection requested via web by Debbie Marino 30# test
|
MEC11-02204
| Rough-in | 7/22/2011 | 7/25/2011 | 7/25/2011 10:10:27 AM | A | FAIL |
|
|
Building Energy will perform the duct blast test on 7/25/11 at 10 am. Phone #: ###-#### >> Inspection requested via web by Debbie Marino ducts install does not match acca manual design
|
MEC11-02241
| Final | 7/22/2011 | 7/25/2011 | 7/25/2011 9:16:25 AM | A | PASS |
|
|
Please contact Paul with any questions.
Thanks. Phone #: ###-#### >> Inspection requested via web by Ted Dumont
|
MEC11-02231
| Rough-in | 7/22/2011 | 7/25/2011 | 7/25/2011 8:47:28 AM | A | PART |
|
|
jason ###-#### ok hard lid ceilings in bathroom
|
MEC10-04003
| DOC - Permit Expired | 7/25/2011 | 7/25/2011 | 7/25/2011 8:01:47 AM | A | PASS |
|
|
|