BLD15-00849
| BLD-Conference | 7/25/2016 | 7/25/2016 | 7/25/2016 5:14:11 PM | P | PART |
|
|
Brian Phone #: ###-####,, walk through for final... trades,, hand/guardrails,, hillside,, etc
|
BLD16-01678
| BLD-Final | 7/25/2016 | 7/25/2016 | 7/25/2016 5:12:53 PM | P | DONE |
|
|
Eric Phone #: ###-####,, done.. gone
|
BLD16-01489
| BLD-Footing | 7/25/2016 | 7/25/2016 | 7/25/2016 5:10:24 PM | P | PART |
|
|
Bill Phone #: ###-####,, lower footing next to garage ok
|
BLD16-00728
| BLD-Final | 7/25/2016 | 7/25/2016 | 7/25/2016 5:08:41 PM | P | DONE |
|
|
Blake Phone #: ###-####
|
BLD16-00728
| BLD-Final | 7/22/2016 | 7/25/2016 | 7/25/2016 5:08:03 PM | P | PASS |
|
|
Blake Phone #: ###-####
|
BLD16-00728
| DOC - Permit Finaled | 7/25/2016 | 7/25/2016 | 7/25/2016 5:07:55 PM | P | PASS |
|
|
c of o issued
|
BLD16-01550
| BLD-Conference | 7/22/2016 | 7/25/2016 | 7/25/2016 2:44:46 PM | P | DONE |
|
|
Adjacent property owner has contracted a licensed survey and found that developers pins are off. Issue CN stating that property pin issue shall be resolved between permit holder and adjacent property owner prior to final occupancy. posted c/n to this effect
|
BLD16-01124
| BLD-Concrete | 7/25/2016 | 7/25/2016 | 7/25/2016 2:28:28 PM | P | PART |
|
|
Brad Phone #: ###-####,, ramp and steps foundation ok
|
MIS16-00224
| BLD-Conference | 7/22/2016 | 7/25/2016 | 7/25/2016 1:25:48 PM | A | PART |
|
|
Complaint of water damaged floor tenant has fallen through. Contact Tammy @ ###-#### for access. Unit #26.,, correction notice posted
|
BLD16-01165
| BLD-Energy code compliance | 7/22/2016 | 7/25/2016 | 7/25/2016 1:23:20 PM | A | CANC |
|
|
Jeff Phone #: ###-####,, not required,,
|
BLD16-00707
| BLD-Energy code compliance | 7/25/2016 | 7/25/2016 | 7/25/2016 1:05:38 PM | P | PASS |
|
|
Insulation // Mark Phone #: ###-####
|
BLD15-04063
| BLD-Wall cover | 7/22/2016 | 7/25/2016 | 7/25/2016 12:52:05 PM | A | PART |
|
|
Shear inside first floor // Kent Phone #: ###-#### main floor corridor shear ok
|
BLD15-04063
| BLD-Framing/Rough-in | 7/22/2016 | 7/25/2016 | 7/25/2016 12:49:24 PM | A | PART |
|
|
Kent Phone #: ###-####,, main floor corridor ceilings ok to prerock
|
BLD15-01107
| BLD-Final | 7/20/2016 | 7/25/2016 | 7/25/2016 11:40:30 AM | A | CANC |
|
|
Ed Phone #: ###-####,, needs f/l/s
|
BLD15-01111
| BLD-Energy code compliance | 7/22/2016 | 7/25/2016 | 7/25/2016 11:39:16 AM | A | PEND |
|
|
4th floor - Ed Phone #: ###-####,, ok pending sprinkler tenting and resolve of the ceiling r valule under overbuild
|
BLD16-00728
| BLD-Final | 7/22/2016 | 7/25/2016 | 7/25/2016 11:06:46 AM | A | PEND |
|
|
Blake Phone #: ###-####
|
BLD16-00499
| BLD-Wall Bracing | 7/21/2016 | 7/25/2016 | 7/25/2016 11:05:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
MIS16-00122
| BLD-Final | 7/22/2016 | 7/25/2016 | 7/25/2016 8:13:34 AM | A | DONE |
|
|
|
MIS16-00122
| DOC - Permit Finaled | 7/25/2016 | 7/25/2016 | 7/25/2016 8:13:23 AM | P | PASS |
|
|
permit issued
|