MEC17-03234
| Final | 7/25/2017 | 7/25/2017 | 7/25/2017 3:45:03 PM | P | PASS |
|
|
3pmish please call Dave ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC17-03234
| Pressure Test | 7/25/2017 | 7/25/2017 | 7/25/2017 3:44:45 PM | P | PASS |
|
|
3pmish please call Dave ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss - 20lb gas pass
|
MEC17-03119
| Rough-in | 7/25/2017 | 7/25/2017 | 7/25/2017 2:55:52 PM | P | PASS |
|
|
LATE PM IF POSSIBLE PLEASE THANK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan
|
MEC16-04911
| Final | 7/20/2017 | 7/25/2017 | 7/25/2017 1:27:30 PM | P | FAIL |
|
|
Please Call Arletta 1 hour Prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby - Need to add A/C to the permit, Pad under A/C needs to be leveled out
|
MEC17-02868
| Final | 7/20/2017 | 7/25/2017 | 7/25/2017 11:28:57 AM | A | FAIL |
|
|
PLEASE CALL OUR INSTALL LEAD GLEN 30 MINS TO ARRIVAL TIME, A LATER AM WOULD BE PREFERRED IF POSSIBLE Phone #: ###-#### Inspection requested via web by Rick Montgomery - Need clearance to combustables on vent pipe
|
MEC17-02166
| Final | 7/25/2017 | 7/25/2017 | 7/25/2017 11:13:25 AM | P | PASS |
|
|
|
MEC17-01320
| Final | 7/18/2017 | 7/25/2017 | 7/25/2017 9:40:39 AM | A | PASS |
|
|
Scheduling plumbing final on gas water heater at same time. PLM17-01192 If possible do both at same time. Call John ###-#### for access. Phone #: ###-#### Inspection requested via web by John Bertram
|
MEC17-03246
| Pressure Test | 7/24/2017 | 7/25/2017 | 7/25/2017 9:21:38 AM | A | PASS |
|
|
call to meet you there it is in the back yard Phone #: ###-#### Inspection requested via web by Rene Neumeyer - 20lb gas pass
|
MEC17-02460
| Final | 7/20/2017 | 7/25/2017 | 7/25/2017 9:08:39 AM | A | PASS |
|
|
Homeowner Jeff Riley ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC17-03190
| Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 8:47:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - No equipment installed at time of rough in. Need to check at final
|
MEC17-03190
| Pressure Test | 7/24/2017 | 7/25/2017 | 7/25/2017 8:46:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - 20lb gas pass
|
MEC17-02929
| Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 8:45:51 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables - Need clearance to combustbles per manufactures instructions. Insulation and vapor barrier are pushed up against fireplace
|
MEC16-05454
| Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 8:09:59 AM | A | CANC |
|
|
Request for inspection on 3rd -7th Floor shafts. Request for above ceiling inspection on 6th Floor apartment. Please contact job lead, Rob, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
MEC17-03119
| Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 7:19:24 AM | A | CANC |
|
|
THANK YOU ###-#### Phone #: ###-#### >> Inspection requested via web by Ben Welgan Inspection cancelled from web by: Ben Welgan
|