PLM02-02269
| Water and/or Sewer | 7/25/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-02270
| Plumbing Rough-in | 7/25/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | A | PART |
|
|
###-#### under floor drain,s test ok 7/26/2002 11:40:27 AM
|
PLM02-02271
| Water and/or Sewer | 7/25/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | A | PASS |
|
|
STEVE ###-####
|
PLM02-02277
| Plumbing Rough-in | 7/25/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | A | PASS |
|
|
###-#### WAYNE
|
PLM02-02278
| Plumbing Rough-in | 7/25/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 17:00:12. Contact: ###-####. rough-in for new floor sink not ready 7/26/2002 11:47:53 AM
|
PLM02-02278
| Final | 7/25/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 17:00:51. Contact: ###-####. moved sink with eye wash from upstair,s to a existing location down stair,s in lab area ( note- no premise protection or lab isolation protection) 7/26/2002 11:51:57 AM
|
PLM02-01669
| Final | 7/26/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/26/2002 at 08:41:52. Contact: ###-####. CANC UNTILL MONDAY THE 29TH
|
PLM02-01662
| Water and/or Sewer | 7/26/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | P | PART |
|
|
dave ###-#### water line water line to back builbing test ok need to test water line to front building still 7/26/2002 3:25:27 PM
|
PLM02-02283
| Plumbing Rough-in | 7/26/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | P | PASS |
|
|
###-#### rough-in and ground work for new restroom test ok 7/26/2002 1:33:44 PM
|
PLM02-01739
| Final | 7/26/2002 | 7/26/2002 | 7/26/2002 12:00:00 AM | P | PASS |
|
|
KIRK; Phone #: ###-####
|