ELE06-01203
| Final | 7/21/2006 | 7/26/2006 | 7/26/2006 3:59:03 PM | P | PASS |
|
|
need final on new building. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH corr made, ok to final, signed card
|
ELE06-02239
| Final | 7/26/2006 | 7/26/2006 | 7/26/2006 3:26:00 PM | P | FAIL |
|
|
met elect, left corr notice, 358.26 there shall not be over 360 degree bends between pullpoints, example between conduit bodies and boxes
|
ELE06-02741
| Electrical Rough-In | 7/25/2006 | 7/26/2006 | 7/26/2006 3:20:18 PM | P | PASS |
|
|
john (cell#) - call for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover u/g for equipotential plane and conduits
|
ELE06-02090
| Final | 7/26/2006 | 7/26/2006 | 7/26/2006 2:38:34 PM | P | PASS |
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corr made, ok to final
|
ELE06-02633
| Conference | 7/25/2006 | 7/26/2006 | 7/26/2006 1:52:40 PM | P | DONE |
|
|
General contractor would like to conference about the classification. Please call with a meeting time.; Phone #: ###-#### Internet Inspection Request from: Celinda Winters met contr and elect to discuss a letter stating purpose of garage
|
ELE06-02704
| Rough-In Permanent Service | 7/25/2006 | 7/26/2006 | 7/26/2006 12:23:46 PM | A | PART |
|
|
jim - Note: underground pipe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover 100' more u/g, same trench
|
ELE06-02750
| Rough-In Permanent Service | 7/25/2006 | 7/26/2006 | 7/26/2006 9:32:21 AM | A | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called contr, left survey, nec 314.20 in walls of combustible material, boxes shall be flush with the finished surface, 210.52(C)(1) recpts shall be within 2' of edge of sink in kitchen, ric ok, p/s u/g n ok
|
ELE06-02742
| Electrical Rough-In | 7/25/2006 | 7/26/2006 | 7/26/2006 8:56:52 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy called, left corr notice, nec 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, BCC all make-up shall be done (foyer box), power riser shall be installed
|
ELE06-02230
| Final | 7/25/2006 | 7/26/2006 | 7/26/2006 8:24:48 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/25/2006 at 4:35:29 PM. Contact: ###-####. ok to final
|