FIR05-00322
| FIR-Aging Inspection | 7/26/2006 | 7/26/2006 | 8/2/2006 1:38:25 PM | | DEFR |
|
|
|
FIR06-00294
| INSP-Sprinkler Rough-in/Hydro | 7/25/2006 | 7/26/2006 | 7/27/2006 7:45:04 AM | P | DEFR |
|
|
Inspection rescheduled per phone call from contractor.
|
FIR06-00321
| INSP-Sprinkler Rough-in/Hydro | 7/25/2006 | 7/26/2006 | 7/26/2006 3:11:32 PM | A | DEFR |
|
|
Contact person not available, inspection rescheduled for 7/27.
|
FIR06-00435
| INSP-Sprinkler Rough-in | 7/25/2006 | 7/26/2006 | 7/26/2006 3:07:37 PM | A | FAIL |
|
|
One head in unit C bathroom needs to be relocated as it is blocked by an adjacent wall, unit A is missing one upright head and armover as shown on plan.
|
BLD06-01765
| FIRE-Conference | 7/25/2006 | 7/26/2006 | 7/26/2006 3:00:54 PM | P | DONE |
|
|
On site confrence to discuss exit signage, emergency lighting, fire sprinkler permit work.
|
FIR05-00713
| INSP-Final Inspection | 7/26/2006 | 7/26/2006 | 7/26/2006 11:43:58 AM | P | PART |
|
|
Forward flow test performed satisfactory, need to provide NFPA 25, noted one fitting is leaking above childrens restroom-to be repaired prior to final.
|
FIR06-00440
| INSP-Sprinkler Rough-in | 7/25/2006 | 7/26/2006 | 7/26/2006 10:58:46 AM | A | PART |
|
|
OH rough-in is acceptable for cover, noted items on previous c/n have been completed, noted possible light fixture obstructions at 1st floor bedroom and one hall due to close proximity to electrical junction boxes, missing drop at one location.
|
FIR06-00188
| INSP-Sprinkler Rough-in | 7/25/2006 | 7/26/2006 | 7/26/2006 10:22:11 AM | A | PART |
|
|
Two heads at common area SE side are overspaced and will need to be relocated, the remainder of overhead rough-in is good for cover at the drop ceilings.
|