PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, July 26, 2011
.
Number of inspections:
7
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC11-00386
General Inspection
7/26/2011
7/26/2011
7/26/2011 4:34:35 PM
CANC
ESC10-00786
BMP Violation
7/18/2011
7/26/2011
7/26/2011 3:43:42 PM
A
PART
Will provide a date of when the tachifier and mulch will be applied on all disturbed soil on the south perimeter of the RC car track. Will follow up on 7/29/2011PM
ESC11-00223
BMP Violation
7/25/2011
7/26/2011
7/26/2011 3:42:15 PM
A
FAIL
Verbal to GC (Randy Rutzel):
Must provide a valid RP with day to day control over operations with all issued permits pertaining to Knife Rivers project at Dallas Harris Subdivision. Will follow up on 7/27/2011 PM.
ESC11-00282
General Inspection
7/26/2011
7/26/2011
7/26/2011 3:39:12 PM
PASS
ESC11-00260
General Inspection
7/26/2011
7/26/2011
7/26/2011 3:39:04 PM
PASS
ESC11-00370
General Inspection
7/22/2011
7/26/2011
7/26/2011 10:01:33 AM
A
FAIL
Verbal to RP:
Provide a washout pit for the duration of the project for all non stormwater polluntants to be cleaned out with9in the provided washout pit. Secure the ESC yellow sign on the wood fence going into the project area.
Explained to the RP that the general contractor must provide an RP for the full duration of the project. Someone who has day to day control of all erosion and sediment conrtol issues pertaining to the project. If one can not be provided a Stop Work Order will be placed on the project until the time being a valid RP is provided. Will re-inspect on 7/27/2011PM.
ESC10-00814
General Inspection
7/26/2011
7/26/2011
7/26/2011 8:24:31 AM
FAIL
Verbal to GC:
Maintain the storm drain in the north west area. Will follow up on 7/28/2011