ESC12-00206
| General Inspection | 7/26/2012 | 7/26/2012 | 7/27/2012 12:00:00 AM | | FAIL |
|
|
On site meeting held with RP and discussed the following: 1. No inlet protection at any of the inlets 2. slope on NE side by canal must be stabilized (straw wattles in place now) 3. Streets shall be regulary swept. Will reinspect 7/30/12
|
ESC11-00525
| BMP Violation | 7/25/2012 | 7/26/2012 | 7/26/2012 12:00:00 AM | A | PART |
|
|
Sediment barrier has been installed along toe of stockpile slopes. Sediment barrier would be more effective if moved back to edge of disturbance (west side of construction site bordering Eckert). Discussed this with RP and it will be corrected. Also discussed with RP the importance of installing wattles/fiber rolls so that they are overlapping with no gaps underneath or between sections. Asked RP to clean sediment and debris around the inlets and the need for daily street sweeping at the entrances
|