Inspections for the day of: Friday, July 26, 2013.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKimberly M. Johnson
TitleEROSION CONTROL
Phone #208-794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-01028 General Inspection7/26/20137/26/20137/29/2013 3:22:53 PM PASS
Permit Finaled
ESC12-01192 Aging Inspection7/26/20137/26/20137/29/2013 11:15:01 AM PASS
Homw complete; close to final stabilization
ESC12-01160 Aging Inspection7/26/20137/26/20137/29/2013 9:46:45 AM PASS
permit finaled
ESC13-00418 General Inspection7/26/20137/26/20137/26/2013 3:48:33 PM PART
Post ESC sign. sediment control will need installed around subsoil stockpile before next forecasted rain event
ESC13-00340 Random Inspection7/26/20137/26/20137/26/2013 3:47:53 PMPPART
Post ESC sign. sediment control will need installed around subsoil stockpile before next forecasted rain event
ESC13-00125 General Inspection7/26/20137/26/20137/26/2013 3:43:55 PM PASS
Construction still active.
ESC13-00013 General Inspection7/26/20137/26/20137/26/2013 3:15:16 PM FAIL
Written Correction notice issued: Repair perimeter control along front of lot and containerize or haul out trash.
ESC13-00354 General Inspection7/26/20137/26/20137/26/2013 2:46:10 PM PASS
Construction exit removed for side walk/subgrade prep. No tracking issues. Need to update ESC sign with correct RP. This was completed during inspection.
ESC13-00344 General Inspection7/26/20137/26/20137/26/2013 2:21:36 PM PASS
Will need to build construction exits to spec prior to rainy season
ESC09-00352 General Inspection7/26/20137/26/20137/26/2013 12:28:57 PM FAIL
Stream bank at end of road (where bridge is slated to go in) still not apprpriately stabilized. See onsite meeting notes from March 7th.
ESC12-01202 Aging Inspection7/26/20137/26/20137/26/2013 12:12:55 PM PASS
ESC12-01202 DOC - Permit Finaled7/26/20137/26/20137/26/2013 12:12:39 PMPPASS
ESC13-00349 General Inspection7/26/20137/26/20137/26/2013 11:53:09 AM PART
Walked project with Chris Sheppard with Diamond Contractors. DI protection in place. Concrete washouts from previous pour were not sized appropriatly and resulted in spillage on ground and gutter. Discussed requirement to control all washouts for next pour; only have sidewalks left to do. Topsoil stockpile has been hauled out and is now inactive. Must stabilize this area within 14 days of inactivity. Notified Chris of this requirement. Will re-inspect in 14 days.
ESC12-01220 Aging Inspection7/26/20137/26/20137/26/2013 11:18:20 AM PASS
Permit finaled
ESC12-01220 DOC - Permit Finaled7/26/20137/26/20137/26/2013 11:17:54 AMPPASS
ESC12-00783 Site Final7/25/20137/26/20137/25/2013 3:07:56 PMAPASS