ELE15-00495
| Conference | 7/26/2016 | 7/26/2016 | 7/26/2016 4:54:56 PM | P | DONE |
|
|
Walk building for TCO items later in the afternoon. Contact Toby Groves ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves Both stairways complete up to top floor. Elecrical openings in stairways are for low volt door controls and communications. Items needed to complete for occupancy are in basement terminate lightning grounding conductor to building steel. Bus duct fire stop needed on all floors. Should be installed Wednesday. 1st floor- emergency corridor grid has not been built as 4pm, no lighting. Fire pump room 1 1/2hr door assembly. Main lobby corridor, elevator lobby, and main lobby grid not complete, trim bathrooms, disconnect handle height, electrical room being used as storage, outdoor egress lighting needs completed. 7th floor- Disconnect handle height, all covers on HVAC unit in equipment rm.
|
ELE15-03952
| Electrical Rough-In | 7/25/2016 | 7/26/2016 | 7/26/2016 11:06:40 AM | A | NH |
|
|
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy Called, left message, waited 10 minutes, must recall Dave called and informed of a 1'x1' soffit that will be built around each room and that electrical not being ran through soffits until rooms are wired.
|
ELE16-02367
| Electrical Rough-In | 7/25/2016 | 7/26/2016 | 7/26/2016 11:02:38 AM | A | PASS |
|
|
PLEASE CALL BILL AND LET ME KNOW ABOUT WHAT TIME YOU WILL BE THERE SO I CAN ARRANGE ACCESS. THANKS Phone #: ###-#### Inspection requested via web by Bob Glenn Far west bathroom remodel rough in ok cover
|
ELE16-02397
| Conference | 7/25/2016 | 7/26/2016 | 7/26/2016 10:42:25 AM | A | DONE |
|
|
would like call ahead to meet; James Phone #: ###-#### Discussed service change. Moving down off of steps with meter main and panel on interior to be located out of closet area and into bed wall. Old panel locations to be junctin points. discussed mast height 6' above roof, 2 ground rods and height of meter and disconnect.
|
ELE16-02398
| Final | 7/25/2016 | 7/26/2016 | 7/26/2016 9:59:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Lott Final ok
|
ELE16-02398
| Electrical Rough-In | 7/26/2016 | 7/26/2016 | 7/26/2016 9:54:27 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Lott Added receptacles to columns and replaced exit lights. Rough in ok
|
ELE16-01823
| Electrical Rough-In | 7/25/2016 | 7/26/2016 | 7/26/2016 9:31:25 AM | A | PASS |
|
|
Please call Clay at ###-#### so he can meet you there. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan Unit insulated prior to inspection. Removed where needed. Rough in ok cover
|
ELE13-02288
| ELE-Aging Inspection | 7/26/2016 | 7/26/2016 | 7/26/2016 8:49:39 AM | | PASS |
|
|
Still under construction
|
ELE13-00565
| ELE-Aging Inspection | 7/26/2016 | 7/26/2016 | 7/26/2016 8:42:09 AM | | CANC |
|
|
too busy
|
ELE15-04086
| ELE-Request for Extension | 7/25/2016 | 7/26/2016 | 7/26/2016 8:26:51 AM | A | PASS |
|
|
Christianwould as early as possible otherwise can you call 15 minutes prior to meet for access Phone #: ###-#### Extension ok
|
ELE16-01823
| Electrical Rough-In | 7/25/2016 | 7/26/2016 | 7/25/2016 4:00:16 PM | A | CANC |
|
|
If you have any questions, please call Clay at ###-####. Thank You!! Phone #: ###-#### >> Inspection requested via web by Clay Morgan Inspection cancelled from web by: Clay Morgan
|