Inspections for the day of: Wednesday, July 26, 2017.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrian Scoles
TitleMEC INSPECTOR
Phone #914-4915
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC17-03203 Final7/20/20177/26/20177/26/2017 4:08:28 PMPPASS
LATE PM IF POSSIBLE. PLEASE CALL BRIAN AT ###-#### Phone #: ###-#### Inspection requested via web by Ben Welgan
MEC17-02905 Final7/19/20177/26/20177/26/2017 3:46:05 PMPPASS
Please call Marla Abbot prior to inspection ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
MEC17-03252 Final7/25/20177/26/20177/26/2017 2:55:03 PMPPASS
PLEASE CALL OUR LEAD INSTALLER GLEN WHEN 30 MINS IN ROUTE- LATER PM INSPECTION WOULD BE PREFERRED IF POSSIBLE Phone #: ###-#### Inspection requested via web by Rick Montgomery
MEC16-05032 Final7/21/20177/26/20177/26/2017 2:12:55 PMPPASS
Please Call Shirley 1 hour before arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby
MEC17-02246 Final7/25/20177/26/20177/26/2017 1:35:03 PMPPASS
Request for final inspection on Sec A and B. Please contact job lead, Derek, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery- signed occupancy card
MEC17-02095 Conference7/25/20177/26/20177/26/2017 11:44:14 AMAFAIL
witness duct blast 1030 am Phone #: ###-#### Inspection requested via web by dannyel chaloupka- furnace needs set to do duct blast- met Connie onsite
MEC17-03197 Rough-in7/25/20177/26/20177/26/2017 11:28:20 AMAFAIL
mechanical fireplace rough in inspection Phone #: ###-#### Inspection requested via web by Dan Otero- living room fireplace needs 2" clearance to b vent per manu install instructions- master bedroom fireplace ok
MEC16-04244 Mec-Aging Inspection7/26/20177/26/20177/26/2017 11:00:52 AM FAIL
no call in for final inspection
MEC17-02871 Final7/24/20177/26/20177/26/2017 10:59:09 AMAPASS
Please call Bill Jones prior to inspection at ###-#### or ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
MEC17-02632 Conference7/25/20177/26/20177/26/2017 10:39:59 AMAFAIL
witness duct blast 930 am Phone #: ###-#### Inspection requested via web by dannyel chaloupka- duct blast failed- 118 cfm loss needs to be no more than 103 cfm
MEC17-02738 Rough-in7/25/20177/26/20177/26/2017 9:06:07 AMAFAIL
EARLY AM INSPECTION IF POSSIBLE PLEASE
THANK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- insulation shield 2nd floor needs 1" clearance to b vent and secured and all pipe enclosed- b vent 2nd floor needs 1" clearance to combustibles at floor level- left correction notice front window
MEC17-02738 Pressure Test7/25/20177/26/20177/26/2017 9:04:19 AMAPART
EARLY AM INSPECTION IF POSSIBLE PLEASE
THANK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- 20lb gas pass- 5lb flue fail guage at 2 psi-
MEC17-03075 Rough-in7/25/20177/26/20177/26/2017 9:00:34 AMAFAIL
EARLY AM IF POSSIBLE PLEASE
TAHNK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- insulation shield needs 1" clearance to b vent and secured- 6" fresh air blocked by b vent to R/A plenum for tie in
MEC17-03075 Pressure Test7/25/20177/26/20177/26/2017 8:58:47 AMAPASS
EARLY AM IF POSSIBLE PLEASE
TAHNK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- 20lb gas pass- 5 lb flue pass