MEC17-03203
| Final | 7/20/2017 | 7/26/2017 | 7/26/2017 4:08:28 PM | P | PASS |
|
|
LATE PM IF POSSIBLE. PLEASE CALL BRIAN AT ###-#### Phone #: ###-#### Inspection requested via web by Ben Welgan
|
MEC17-02905
| Final | 7/19/2017 | 7/26/2017 | 7/26/2017 3:46:05 PM | P | PASS |
|
|
Please call Marla Abbot prior to inspection ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC17-03252
| Final | 7/25/2017 | 7/26/2017 | 7/26/2017 2:55:03 PM | P | PASS |
|
|
PLEASE CALL OUR LEAD INSTALLER GLEN WHEN 30 MINS IN ROUTE- LATER PM INSPECTION WOULD BE PREFERRED IF POSSIBLE Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
MEC16-05032
| Final | 7/21/2017 | 7/26/2017 | 7/26/2017 2:12:55 PM | P | PASS |
|
|
Please Call Shirley 1 hour before arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
MEC17-02246
| Final | 7/25/2017 | 7/26/2017 | 7/26/2017 1:35:03 PM | P | PASS |
|
|
Request for final inspection on Sec A and B. Please contact job lead, Derek, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery- signed occupancy card
|
MEC17-02095
| Conference | 7/25/2017 | 7/26/2017 | 7/26/2017 11:44:14 AM | A | FAIL |
|
|
witness duct blast 1030 am Phone #: ###-#### Inspection requested via web by dannyel chaloupka- furnace needs set to do duct blast- met Connie onsite
|
MEC17-03197
| Rough-in | 7/25/2017 | 7/26/2017 | 7/26/2017 11:28:20 AM | A | FAIL |
|
|
mechanical fireplace rough in inspection Phone #: ###-#### Inspection requested via web by Dan Otero- living room fireplace needs 2" clearance to b vent per manu install instructions- master bedroom fireplace ok
|
MEC16-04244
| Mec-Aging Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 11:00:52 AM | | FAIL |
|
|
no call in for final inspection
|
MEC17-02871
| Final | 7/24/2017 | 7/26/2017 | 7/26/2017 10:59:09 AM | A | PASS |
|
|
Please call Bill Jones prior to inspection at ###-#### or ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC17-02632
| Conference | 7/25/2017 | 7/26/2017 | 7/26/2017 10:39:59 AM | A | FAIL |
|
|
witness duct blast 930 am Phone #: ###-#### Inspection requested via web by dannyel chaloupka- duct blast failed- 118 cfm loss needs to be no more than 103 cfm
|
MEC17-02738
| Rough-in | 7/25/2017 | 7/26/2017 | 7/26/2017 9:06:07 AM | A | FAIL |
|
|
EARLY AM INSPECTION IF POSSIBLE PLEASE THANK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- insulation shield 2nd floor needs 1" clearance to b vent and secured and all pipe enclosed- b vent 2nd floor needs 1" clearance to combustibles at floor level- left correction notice front window
|
MEC17-02738
| Pressure Test | 7/25/2017 | 7/26/2017 | 7/26/2017 9:04:19 AM | A | PART |
|
|
EARLY AM INSPECTION IF POSSIBLE PLEASE THANK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- 20lb gas pass- 5lb flue fail guage at 2 psi-
|
MEC17-03075
| Rough-in | 7/25/2017 | 7/26/2017 | 7/26/2017 9:00:34 AM | A | FAIL |
|
|
EARLY AM IF POSSIBLE PLEASE TAHNK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- insulation shield needs 1" clearance to b vent and secured- 6" fresh air blocked by b vent to R/A plenum for tie in
|
MEC17-03075
| Pressure Test | 7/25/2017 | 7/26/2017 | 7/26/2017 8:58:47 AM | A | PASS |
|
|
EARLY AM IF POSSIBLE PLEASE TAHNK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- 20lb gas pass- 5 lb flue pass
|