Inspections for the day of: Wednesday, July 26, 2017.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00675 INSP-Supply line flush7/25/20177/26/20177/26/2017 2:56:58 PMPDONE
Underground main supply flush complete.
FIR16-00699 INSP-Supply line flush7/25/20177/26/20177/26/2017 2:56:43 PMPDONE
Underground main supply flush complete.
BLD16-02245 FIRE-Final Inspection7/26/20177/26/20177/26/2017 2:56:06 PMPPASS
Previously noted items have been repaired. No fire sprinklers, only fire alarms are in-duct detection with stand alone annunciators (not monitored), fire extinguishers are in place with current inspection tags. Final life fire safey inspection passed/complete.
FIR16-00698 INSP-Supply line flush7/25/20177/26/20177/26/2017 1:51:39 PMPDONE
Underground main supply flush complete.
FIR16-00697 INSP-Supply line flush7/25/20177/26/20177/26/2017 1:51:14 PMPDONE
Underground main supply flush complete.
FIR16-00794 INSP-Sprinkler Rough-in/Hydro7/25/20177/26/20177/26/2017 12:28:19 PMPPASS
Hydrostatic test for overhead fire sprinkler piping complete.
FIR17-00226 INSP-Final Inspection7/25/20177/26/20177/26/2017 10:56:37 AMAPASS
Final fire alarm inspection for area of work associated with this permit passed/complete.
FIR17-00361 INSP-Sprinkler Rough-in7/25/20177/26/20177/26/2017 9:42:04 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping/pendant heads located above hardlids complete, approved for cover.
FIR16-00794 INSP-Supply line flush7/25/20177/26/20177/26/2017 9:34:08 AMADONE
Underground main line flush complete
FIR16-00563 INSP-Final Inspection7/25/20177/26/20177/26/2017 8:38:29 AMACANC
Wrong FIR permit called in, verified with Mike Phone #: ###-####, this request is cancelled.
BLD16-04350 FIRE-Final Inspection7/25/20177/26/20177/26/2017 8:31:34 AMAPART
Project is being worked in phases, life fire safety passed/complete for phase 1 (On site city apprroved plans has phase 1 area highlighted in pink and phase 2 area highlighted in yellow) South entrance has thumbturn deadbolt currently in place, this will need to be changed to single action door hardware before phase 2 life fire safety inspection.
BLD16-01060 FIRE-Final Inspection7/26/20177/26/20177/26/2017 8:26:10 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Michael West Inspection cancelled from web by: Michael West
FIR16-00449 INSP-Final Inspection7/25/20177/26/20177/25/2017 3:54:25 PMAPASS
Final inspection for underground supply passed/complete