Inspections for the day of: Thursday, July 27, 2000.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Tawney
TitleFIRE INSPECTOR
Phone #340-1295
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00479 FIRE-Final Inspection7/26/20007/27/20007/27/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/26/2000 at 13:59:30. Contact: . Reinsp. ok for perm. occ. 7/27/00 1:54:13 PM
FIR00-00250 INSP-Sprinkler Rough-in/Hydro7/26/20007/27/20007/27/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/26/2000 at 16:28:35. Contact: ###-####. OK on hydro test for subs area C/N issued for spklr. R/I 7/27/00 1:54:40 PM
BLD00-01504 FIRE-Final Inspection7/27/20007/27/20007/27/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/27/2000 at 09:39:13. Contact: ###-####. Sprinkler system needs annual inspection. 7/28/00 10:02:12 AM
BLD00-01504 FIRE-Sprinkler Rough-in7/27/20007/27/20007/27/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/27/2000 at 09:40:44. Contact: ###-####. Sprinkler system needs annual inspection. 7/28/00 10:03:25 AM
BLD99-00682 FIRE-Final Inspection7/27/20007/27/20007/27/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/27/2000 at 10:48:57. Contact: . Reinsp. ok for perm. occ. 7/28/00 10:04:40 AM
BLD00-01530 FIRE-Final Inspection7/26/20007/27/20007/27/2000 12:00:00 AMPPART
Jeff ###-#### Spklr. R/I 2 middle areas 2 column obstructions & install 2 heads. 7/28/00 10:04:33 AM