BLD00-01644
| BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | FAIL |
|
|
JACK ###-#### FR C/N left (straps) 7/27/00 2:00:38 PM
|
BLD99-03426
| BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | PASS |
|
|
###-#### Ok to insulate 7/27/00 1:59:54 PM
|
BLD99-03667
| BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 13:02:35. Contact: ###-####. ok to sheetrock 7/27/00 2:00:26 PM
|
BLD00-00828
| BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 13:28:44. Contact: ###-####. C/N not done 7/27/00 1:59:34 PM
|
BLD00-02117
| BLD-Final | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | PASS |
|
|
Ron with Boise Demo ###-#### first thing am please thank you site check for demo Finishing up looks ok. 7/27/00 2:00:05 PM
|
BLD00-01583
| BLD-Footing | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | PART |
|
|
Daniel ###-#### With verbal corrections. 7/27/00 1:53:57 PM
|
BLD00-01914
| BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 14:20:26. Contact: . Ok to insulate 7/27/00 1:59:46 PM
|
BLD00-01458
| BLD-Footing | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 09:55:39. Contact: ###-####. Appears ok 7/27/00 1:53:48 PM
|
BLD00-01684
| BLD-Foundation | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 19:19:08. Contact: ###-####. With verbal corrections. 7/27/00 2:00:15 PM
|
BLD00-02156
| BLD-Wall cover | 7/27/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 09:43:40. Contact: ###-####. Ok to sheet rock 7/28/00 10:00:28 AM
|
BLD00-00828
| BLD-Framing/Rough-in | 7/27/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 11:27:50. Contact: . C/n not done 7/28/00 10:01:50 AM
|
BLD00-01290
| BLD-Final | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | P | PASS |
|
|
Dan ###-####
|
BLD97-03080
| BLD-Final | 7/26/2000 | 7/27/2000 | 7/27/2000 12:00:00 AM | P | PASS |
|
|
after lunch Mike Atwood ###-#### #19740 C of C issued need seperate BP to finish back stairs as on arig. BP/main front steps (concrete) not to code, owner made woodsteps next to them to pass code- wood steps won't stay after insepction is done- temp. glass on back porch is on order- 4wks. 7/28/00 10:01:43 AM
|