MEC01-01952
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PART |
|
|
dryer vents outside by deck door have 90 degree elbows run backwards, check when do southside 7/27/2001 12:51:48 PM
|
MEC01-02080
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
c/n posted 7/27/2001 12:05:16 PM
|
MEC01-02080
| Pressure Test | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
two test, no indication of which test is for 15 n orchard 7/27/2001 12:05:58 PM
|
MEC01-01645
| Final | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 14:37:13. Contact: ###-####.
|
MEC01-02227
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
no gasline inspection or pressure test 7/27/2001 12:17:59 PM
|
MEC01-01449
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
wanted final on office, c/n posted for office to duct all return airs and extend u.h. vent above roof for 75% rule 7/27/2001 10:37:21 AM
|
MEC01-02195
| Rough-in | 7/25/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-02195
| Final | 7/25/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
c/n posted 7/27/2001 11:09:49 AM
|
MEC01-01474
| Final | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 09:36:12. Contact: ###-####.
|
MEC01-02026
| Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | CANC |
|
|
already sticker on window 7/27/2001 3:42:24 PM
|
MEC01-02026
| Pressure Test | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
no gas piping done 7/27/2001 3:41:49 PM
|
MEC01-01508
| Final | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
c/n posted 7/27/2001 3:11:20 PM
|
MEC01-02020
| Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | CANC |
|
|
cancelled by builder 7/27/2001 2:55:27 PM
|
MEC01-02231
| Final | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
no answer 7/27/2001 4:10:51 PM
|
MEC01-01251
| Final | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
still no range exhaust 7/27/2001 3:52:15 PM
|
MEC01-00901
| Pressure Test | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 10:10:56. Contact: ###-####.
|
MEC01-02232
| Final | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | CANC |
|
|
furnace, gas line reconnect 6 heat runs and 2 return airs ###-####
|
MEC01-02232
| Pressure Test | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | CANC |
|
|
###-####
|