BLD01-01470
| BLD-Framing/Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PART |
|
|
###-#### eggplant} ok to sheetrock store front ,will need engineer to accept special inspection report for welded beam connections. contractor to provide this letter at next inspection. 7/27/2001 12:39:04 PM
|
MEC01-02221
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 12:06:43. Contact: ###-####.c/n posted to seal return air can. 7/27/2001 10:50:11 AM
|
MEC01-02221
| Pressure Test | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 12:07:04. Contact: ###-####.
|
BLD01-00710
| BLD-Final | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 15:20:34. Contact: ###-####.ok temp oc needs all req signatures for perm oc and c/n rest room mirror. 7/27/2001 11:46:00 AM
|
BLD00-03498
| BLD-Other | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 15:40:32. Contact: ###-####.c/n posted. 7/27/2001 10:49:43 AM
|
BLD01-01979
| BLD-Foundation | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 407 On 7/27/2001 11:27:23 AM
|
BLD00-03194
| BLD-Framing/Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 07:54:39. Contact: .need a fire damper in the auto parts room,also prior note needs to be addressed also the 1 hour duct chase for exhaust ,also plumbing inspection. they called for a lower floor partial area only. 7/27/2001 3:50:13 PM
|
MEC01-02188
| Pressure Test | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | NH |
|
|
###-#### Pat Herman .i am here it is 3pm no one home. 7/27/2001 3:08:30 PM
|
MEC01-02188
| Final | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | NH |
|
|
Pat Herman ###-####, no one home at 3pm. 7/27/2001 3:08:44 PM
|
BLD01-01343
| BLD-Other | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 09:22:28. Contact: ###-####.needs 3 pods in rooms over 144sq ft and light wires tied in far left office west side and all vertical pods in place now need the 4 way wire bracing installed. 7/27/2001 3:48:20 PM
|
BLD01-00890
| BLD-Framing/Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | PASS |
|
|
###-#### ceiling grid
|
BLD01-01979
| BLD-Footing | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | NR |
|
|
###-####
|