MEC01-02190
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
John ###-#### CORRECTIONS NOT DONE..42.00 FEE 7/27/2001 10:26:27 AM
|
MEC01-02003
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 16:07:27. Contact: ###-####. GAS OK..WAITING ON INFO FROM CARL ON DAMPERS 7/27/2001 11:31:00 AM
|
MEC01-02214
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
mr lemmons ###-#### POSTED CORRECTIONS..CALLED CONT 7/27/2001 11:10:03 AM
|
MEC01-01679
| Pressure Test | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-01661
| Final | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 11:13:27. Contact: . CORRECTIONS POSTED...NO PHONE NUMBER 7/27/2001 10:35:22 AM
|
MEC01-01782
| Final | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
Lewis ###-#### reinspection
|
MEC01-02210
| Final | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 12:37:09. Contact: ###-####.
|
MEC01-02204
| Conference | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 411 On 7/27/2001 10:11:48 AM OK''D FURN IN CLOSET
|
MEC98-01873
| Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
###-####
|
MEC01-01595
| Final | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
###-#### garage code 7550 posted corrections...called jerry 7/27/2001 1:20:29 PM
|
MEC01-02127
| Final | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-02192
| Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 08:17:52. Contact: ###-####. called #... the guy didn't know anything about this 7/27/2001 2:47:57 PM
|
MEC01-02126
| Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 08:23:16. Contact: ###-####.
|
MEC01-02229
| Pressure Test | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 08:45:53. Contact: ###-####....###-#### 7/27/2001 1:33:32 PM need comb air..gas flex conn not right size 7/27/2001 3:49:53 PM
|
MEC01-02230
| Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-02230
| Pressure Test | 7/27/2001 | 7/27/2001 | 7/27/2001 12:00:00 AM | P | PASS |
|
|
###-####
|