FIR04-00812
| INSP-Supply line flush | 7/27/2005 | 7/27/2005 | 7/27/2005 3:11:46 PM | A | FAIL |
|
|
Underground fire supply work appears to be installed in a satisfactory manner, however the resubmitted plans and notes with scope of work does not address phase 2 (connection to city supply) work. This work must be submitted and approved prior to field inspection and sign off.
|
FIR05-00401
| INSP-Sprinkler Rough-in/Hydro | 7/27/2005 | 7/27/2005 | 7/27/2005 2:36:08 PM | P | PART |
|
|
Overhead rough-in for antifreeze system at front canopy is acceptable to cover.
|
FIR05-00401
| INSP-Sprinkler Rough-in/Hydro | 7/27/2005 | 7/27/2005 | 7/27/2005 12:00:00 AM | P | PART |
|
|
Overhead hydrostatic test of antifreeze system at front canopy is satisfactory.
|
BLD04-02409
| FIRE-Conference | 7/27/2005 | 7/27/2005 | 7/27/2005 12:00:00 AM | P | DONE |
|
|
On site discussion with Nick the general contractor regarding fire department lane and street access requirements.
|