FIR05-00455
| FIR-Aging Inspection | 7/27/2006 | 7/27/2006 | 8/2/2006 1:38:38 PM | | DEFR |
|
|
|
FIR06-00321
| INSP-Sprinkler Rough-in/Hydro | 7/27/2006 | 7/27/2006 | 7/28/2006 7:34:17 AM | P | FAIL |
|
|
Approved plans and review notes were not on site for inspection, noted some general items to the contractor which will need correction at the riser.
|
BLD06-00222
| FIRE-Final Inspection | 7/27/2006 | 7/27/2006 | 7/28/2006 7:32:02 AM | P | PASS |
|
|
Fire life safety is satisfactory.
|
FIR05-00713
| INSP-Final Inspection | 7/27/2006 | 7/27/2006 | 7/28/2006 7:31:02 AM | P | PASS |
|
|
Corrections have been completed, fire sprinkler permit finaled.
|
FIR06-00294
| INSP-Sprinkler Rough-in/Hydro | 7/27/2006 | 7/27/2006 | 7/27/2006 2:31:51 PM | P | PART |
|
|
OH hydrostatic test for phase 2 remodel including bld 2 and 3 is satisfactory, OH rough in is good for cover at the drop ceiling areas for bld 2 and 3- fire caulking at 2-hr wall penetrations completed while on site.
|
FIR06-00272
| INSP-Final Inspection | 7/26/2006 | 7/27/2006 | 7/27/2006 2:27:33 PM | A | PASS |
|
|
Required corrections have been verified, one non functional RTS for duct detector 12 has been repaired, fire alarm permit finaled.
|
FIR06-00321
| INSP-Sprinkler Rough-in/Hydro | 7/26/2006 | 7/27/2006 | 7/27/2006 11:31:09 AM | A | DEFR |
|
|
Duplicate inspection request.
|
BLD05-00849
| FIRE-Conference | 7/25/2006 | 7/27/2006 | 7/27/2006 11:30:10 AM | A | DONE |
|
|
On site confrence to discuss project related fire alarm, cooking hood, and fire life safety work issues necessary to final BLD permits and establish an occupancy certificate. 60 day timeline for completion established with building manager and contractor.
|
BLD06-00957
| FIRE-Final Inspection | 7/26/2006 | 7/27/2006 | 7/27/2006 9:41:49 AM | A | PASS |
|
|
Items on c/n have been verified for completion, fire life safety inspection passed.
|
FIR06-00480
| INSP-Sprinkler Rough-in/Hydro | 7/25/2006 | 7/27/2006 | 7/27/2006 9:40:31 AM | A | PASS |
|
|
OH fire sprinkler work is satisfactory.
|