BLD09-00584
| BLD-Framing/Rough-in | 7/27/2009 | 7/27/2009 | 7/27/2009 4:38:10 PM | P | PART |
|
|
kevin Phone #: ###-#### or ###-#### shear ok after fixes,, conf on frame,, need elec r/in
|
ESC09-00437
| Site Preparation | 7/27/2009 | 7/27/2009 | 7/27/2009 4:25:14 PM | P | FAIL |
|
|
still in fail mode,, see 460 notes
|
ESC09-00152
| Site Preparation | 7/27/2009 | 7/27/2009 | 7/27/2009 4:23:59 PM | P | PART |
|
|
Work in progress
|
ESC08-00976
| Random Inspection | 7/27/2009 | 7/27/2009 | 7/27/2009 3:55:04 PM | P | PART |
|
|
wip, daily clean up
|
BLD09-01168
| BLD-Footing | 7/27/2009 | 7/27/2009 | 7/27/2009 3:53:31 PM | P | NR |
|
|
footing and wall inspection//PJ Phone #: ###-#### need soils report ok from T.R. public works 1st
|
BLD09-00398
| BLD-Footing | 7/27/2009 | 7/27/2009 | 7/27/2009 3:27:26 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/27/2009 at 7:53:54 AM. Contact: ###-####. 2 north pad ftgs,, pending S. I. report
|
BLD08-02382
| BLD-Foundation | 7/27/2009 | 7/27/2009 | 7/27/2009 2:15:24 PM | P | PART |
|
|
As early as possible please Phone #: ###-####
|
BLD09-00464
| BLD-Framing/Rough-in | 7/24/2009 | 7/27/2009 | 7/27/2009 12:24:51 PM | A | PART |
|
|
craig Phone #: ###-#### steel angles in pront portico,, seismic braces,, ok pending S.I. reports
|
BLD09-00109
| BLD-Framing/Rough-in | 7/24/2009 | 7/27/2009 | 7/27/2009 11:23:13 AM | A | PART |
|
|
harry Phone #: ###-#### 2 hr ok
|