Inspections for the day of: Monday, July 27, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC04-00362 DOC - Permit Finaled7/27/20097/27/20097/27/2009 4:06:34 PMPPASS
ESC05-01866 DOC - Permit Finaled7/27/20097/27/20097/27/2009 4:06:24 PMPPASS
ESC05-01771 DOC - Permit Finaled7/27/20097/27/20097/27/2009 3:46:42 PMPPASS
ESC09-00344 Site Preparation7/21/20097/27/20097/27/2009 3:20:28 PMPNR
ESC09-00316 Site Preparation7/27/20097/27/20097/27/2009 2:15:29 PM PASS
No effecting anything. in the lumber yard.
ESC09-00045 Site Final5/26/20097/27/20097/27/2009 2:13:33 PMANR
ESC09-00435 Site Preparation7/27/20097/27/20097/27/2009 2:13:08 PM PASS
ESC08-00952 Tracking Control7/27/20097/27/20097/27/2009 1:52:11 PMPFAIL
Message to RP:
CLean up tracking off of site at the South West end of project area. Will re-inspect on 7/29/09am
ESC09-00455 Site Preparation7/27/20097/27/20097/27/2009 11:02:11 AM NR
ESC09-00456 Site Preparation7/27/20097/27/20097/27/2009 10:15:18 AM NR
ESC09-00437 Site Preparation7/27/20097/27/20097/27/2009 9:11:26 AM FAIL
Verbal to RP and GC:
Install there sediment barrier per industry specs.
Clean up all concrete residual outside of the washout pit.
Will re-inspect on 7/30/09 PM.