FIR10-00362
| INSP-Final Inspection | 7/27/2010 | 7/27/2010 | 7/27/2010 2:50:08 PM | P | PASS |
|
|
Fire sprinkler modification passed field inspection. Permit final approved.
|
BLD10-01445
| FIRE-Final Inspection | 7/26/2010 | 7/27/2010 | 7/27/2010 2:48:32 PM | P | PASS |
|
|
Life safety okayed with the exception of the "door to remain unlocked while building is occupied" sign at the main entry/exit. This item to be verified for compliance at structural final as discussed with the tenant representative.
|
BLD10-01324
| FIRE-Final Inspection | 7/26/2010 | 7/27/2010 | 7/27/2010 12:03:47 PM | A | PASS |
|
|
Fire life safety inspection passed.
|
BLD10-01350
| FIRE-Final Inspection | 7/26/2010 | 7/27/2010 | 7/27/2010 9:52:40 AM | A | PASS |
|
|
Fire life safety final approved, inspection passed.
|
FIR10-00310
| INSP-Final Inspection | 7/27/2010 | 7/27/2010 | 7/27/2010 9:51:50 AM | P | PASS |
|
|
Final walkthrough completed satisfactory. Fire sprinkler permit finaled.
|