Inspections for the day of: Tuesday, July 27, 2010.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00496 Site Preparation7/21/20107/27/20107/27/2010 3:51:27 PMANR
ESC10-00166 Site Final7/26/20107/27/20107/27/2010 1:16:15 PMAPASS
Patricia Phone #: ###-####
ESC06-00464 Complaint Inspection7/27/20107/27/20107/27/2010 11:12:35 AMPFAIL
Verbal message to RP:
CLean up all gutter pans with the construction site of all sediment and debris including but not limited to the concrete residual.
Install a sediment barrier along the disturbed soil at the pnd arar to the south of the vertical construction.
Also provide storm drain inlet protection aat the storm drain located at the corner of Hiwatha and Gatewood. Will re-inspect on 7/28/10 PM.
ESC10-00523 Site Preparation7/26/20107/27/20107/27/2010 11:08:38 AMACANC
ESC09-00352 BMP Violation7/22/20107/27/20107/27/2010 11:08:10 AMAFAIL
Correction Notice:
Message to Wetlands Group:
1. Install a Stabilized construction exit over into the north west area at the lift station per industry standards.
2. Contact the city with updated RP information of a valid certified RP who will have day to day control of erosion and sediment control operations.
Failure to comply by 07/27/2010 will result in a Stop Work Order. Will re-inspect on 07/28/2010
ESC10-00435 BMP Violation7/26/20107/27/20107/27/2010 10:31:11 AMPPASS
ESC10-00434 BMP Violation7/26/20107/27/20107/27/2010 10:30:51 AMPPASS
ESC10-00437 BMP Violation7/26/20107/27/20107/27/2010 10:30:27 AMPPASS
ESC10-00438 BMP Violation7/26/20107/27/20107/27/2010 10:30:02 AMPPASS
ESC10-00115 General Inspection7/27/20107/27/20107/27/2010 8:43:15 AM DONE
ESC10-00115 DOC - Permit Finaled7/27/20107/27/20107/27/2010 8:42:25 AMPPASS