Inspections for the day of: Wednesday, July 27, 2011.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00164 INSP-Final Inspection7/25/20117/27/20117/27/2011 4:52:07 PMPPASS
Fire alarm permit work passed field testing. Permit finaled.
FIR11-00356 INSP-Sprinkler Rough-in7/27/20117/27/20117/27/2011 4:51:11 PMPPART
Scope of fire sprinkler modifications are approved for ceiling cover.
FIR10-00540 INSP-Sprinkler Rough-in/Hydro7/27/20117/27/20117/27/2011 4:49:51 PMPPART
OH hydrostatic testing finished for the 1st, 2nd, and 3rd floor systems including the deluge valve and standpipe.
FIR11-00285 INSP-Sprinkler Rough-in7/27/20117/27/20117/27/2011 4:48:26 PMPPART
See stamped plan set for dated red lines indicating location of work completed and approved for bury.
FIR11-00180 INSP-Sprinkler Rough-in7/27/20117/27/20117/27/2011 4:45:13 PMPPART
Missing retainers added at end branch lines. Overhead okayed to cover.
BLD11-00718 FIRE-Final Inspection7/27/20117/27/20117/27/2011 4:44:05 PMPNR
Final pending completion of project related fire alarm permit work.
BLD10-02916 FIRE-Final Inspection7/27/20117/27/20117/27/2011 4:43:11 PMAPASS
FIR11-00340 INSP-Final Inspection7/26/20117/27/20117/27/2011 4:42:41 PMAPART
Rough-in inspection completed. Final pending removal of temporary walls for adequate coverage at the remodel area.
FIR10-00137 INSP-Conference7/27/20117/27/20117/27/2011 4:41:28 PMADONE
Zach phone #: ###-#### Regarding corrections and final inspection schedule.
FIR08-00239 INSP-Sprinkler Rough-in7/27/20117/27/20117/27/2011 4:39:19 PMAPART
Reference dated plan annotations.