Inspections for the day of: Monday, July 27, 2015.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00815 INSP-Final Inspection7/27/20157/27/20157/27/2015 4:15:14 PMPFAIL
Rooms with items that need to be repaired/replaced & re-inspected:
Section 2/2: rooms 230 wrong head in restroom, 232 restroom head cleaned and 2nd floor vending wrong head installed.
Section 3/1: 302 painted head, 306 missing escutcheon, 307 painted head, 321 sidewalls painted, 320 sidewalls painted
Section 3/2: 325 mech room head painted, 327bedroom head to 401 escutcheon, 328 incorrect head, 332 painted sidewall, 336 painted head restroom, 337 mech room head painted, 338 painted head restroom
FIR15-00506 INSP-Final Inspection7/27/20157/27/20157/27/2015 2:01:48 PMPPASS
Final fire sprinkler inspection passed/complete
FIR15-00473 INSP-Final Inspection7/27/20157/27/20157/27/2015 1:42:26 PMPPASS
Final fire sprinkler inspection passed/complete
FIR15-00473 INSP-Sprinkler Rough-in7/27/20157/27/20157/27/2015 1:41:26 PMPPASS
Rough to cover inspection passed/complete
FIR14-00750 INSP-Sprinkler Rough-in7/27/20157/27/20157/27/2015 11:16:20 AMPPART
Notated area's inspected and approved for cover with red ink on city approved drawings
FIR14-00683 INSP-Sprinkler Rough-in7/24/20157/27/20157/27/2015 11:12:11 AMACANC
Incorrect FIR number for todays inpsection, FIR number for building K to be called in by contractor, verified per conversation with onsite point of contact, Leroy, phone #: ###-####
FIR14-00628 INSP-Final Inspection7/26/20157/27/20157/27/2015 8:48:38 AMAPASS
Previously noted items corrected, Dry pendant escutcheons on order, will be installed when received, fire sprinkler inspection passed/complete