Inspections for the day of: Monday, July 27, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00655 BMP Violation7/24/20157/27/20157/27/2015 4:26:11 PMPPART
Raymond Street. sidewalk, and gutter has been swept and uncontained trash was picked up.

Remaining corrections:
- empty full trash/waste containers within site
- pick up wind blown litter in swale by north entrance off Raymond

Corrections in progress, good initial response to corrections issued, but site still needs some work.
MIS15-00185 ESC-Conference7/24/20157/27/20157/27/2015 4:04:22 PMPDONE
Now working under proper permits. See ESC15-00967
ESC13-00230 General Inspection7/27/20157/27/20157/27/2015 10:34:56 AM PASS
WIP on homes on Grand Prairie (upper side of loop). Contractors taking care to keep clean even though 5 homes going at once. No significant amount of sediment, trackout, or building materials in gutters and street. No spills or discharges observed. BMPs installed as needed. No corrections.
ESC14-00206 General Inspection7/27/20157/27/20157/27/2015 9:53:27 AM PASS
New washout for SFHs in phase was installed at west end of Bear Ridge as requested and utilized. Near 75% capacity and needs to be replaced this week.

No trackout or discharges. Old washout that was being used was cleaned/removed. Approved.
ESC14-00762 Aging Inspection7/27/20157/27/20157/27/2015 9:43:29 AM PASS
Project complete. No unstabilized area/loose dirt or temp BMPs remaining. All permits finaled.
ESC14-00762 DOC - Permit Finaled7/27/20157/27/20157/27/2015 9:35:59 AMPPASS
MIS15-00184 ESC-Conference7/24/20157/27/20157/27/2015 9:20:44 AMADONE
Call Riley Planning Services (see info for 2005 N. 20th) ###-####

Parcel owned by McCown properties, which is building new house and owns lot with the hole. Will address corrections for hole during site preparation. A safety fence should be installed around perimeter.
ESC13-00213 General Inspection7/27/20157/27/20157/27/2015 8:36:21 AM PART
Recent rains caused considerable erosion and sediment runoff, but the hillside affected has been re-tracked and wattles and sediment/drainage diversion trench has been constructed.

No trackout or dirt remaining in culdesace but private drain system on site has lot of mud and debris within that needs cleaning. RPC has recently built additional retaining walls within site that have further stabilized slopes.

WIP on landscaping, regrading, and wall placement. No immediate corrections issued.