ELE16-00303
| Electrical Rough-In | 7/27/2016 | 7/27/2016 | 7/27/2016 4:20:24 PM | P | PART |
|
|
Ceiling cover inspection where available. Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves Grid as noted on contractor print for levels 2 and 3 rough in ok cover. areas not ready are 353, 358, 363, 221 240, 241, 242, 243, open area north side fixture whip.
|
ELE15-00495
| Electrical Rough-In | 7/27/2016 | 7/27/2016 | 7/27/2016 4:15:51 PM | P | PART |
|
|
TCO walk. Wall rough in for cover stair 4. Ceiling inspection cover first floor lobby. Contact Toby Groves ###-####. As late in the afternoon as possible for your schedule. Phone #: ###-#### Inspection requested via web by Toby Groves Stair 4 floors 2 thru 5 wall rough in ok cover. 1st floor main lobby only and elevator lobby grid rough in ok cover
|
ELE16-01838
| Electrical Rough-In | 7/27/2016 | 7/27/2016 | 7/27/2016 2:57:06 PM | P | PASS |
|
|
Level 2 4 5 6 underfloor Furniture Conn. Phone #: ###-#### Inspection requested via web by Tom Betty Spot check whip connection for furniture. Listing and rough in ok cover
|
ELE15-01348
| Electrical Rough-In | 7/27/2016 | 7/27/2016 | 7/27/2016 2:51:18 PM | P | PASS |
|
|
MDBCC Dist. and more EQ feeders and LS feeders level 5 thru 9 RDBB level 10 and VFD Cooling Towers and Controls AHU 1,2,3 Feeders and other MDBCC equip Phone #: ###-#### Inspection requested via web by Tom Betty Areas noted rough in ok cover and energize. furniture whip all have dedicated neutrals for each and all circuits. Discussed door joining 2 electrical rms. 110.12(C)(2)(b)- If work depth is double only 1 door for egress is required however 2nd door exist and is within 25' from gear and shall open out of each room for egress or be removed.
|
ELE16-02161
| Permanent Service | 7/26/2016 | 7/27/2016 | 7/27/2016 11:48:54 AM | A | FAIL |
|
|
If you have any questions, please call Jared ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan 110.14- Dissimilar metals shall not be in contact with each other. 110.22- Each disconnecting means shall be identified as to it purpose.
|
ELE16-02160
| Permanent Service | 7/26/2016 | 7/27/2016 | 7/27/2016 11:48:02 AM | A | FAIL |
|
|
If you have any questions, please call Jared ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan 110.14- Dissimilar metals shall not be in contact with each other. 110.22- Each disconnecting means shall be identified as to it purpose.
|
ELE16-02159
| Permanent Service | 7/26/2016 | 7/27/2016 | 7/27/2016 11:47:10 AM | A | FAIL |
|
|
If you have any questions, please call Jared ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan 110.14- Dissimilar metals shall not be in contact with each other. 110.22- Each disconnecting means shall be identified as to it purpose.
|
ELE16-01823
| Permanent Service | 7/26/2016 | 7/27/2016 | 7/27/2016 11:46:19 AM | A | FAIL |
|
|
If you have any questions, please call Jared ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan 110.14- Dissimilar metals shall not be in contact with each other. 110.22- Each disconnecting means shall be identified as to it purpose.
|
ELE16-01946
| Conference | 7/26/2016 | 7/27/2016 | 7/27/2016 10:53:10 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed work clearence for HVAC units in ceiling areas. Piping that has been installed limits access to control box on units. 110.26 requires 36" however where not possible less OK. Shall not be less than 18" clear access.
|
ELE15-03901
| Electrical Rough-In | 7/26/2016 | 7/27/2016 | 7/27/2016 10:33:40 AM | A | PART |
|
|
Call Pierce for inspection of 8th floor ceiling grid areas and 9th floor reception desk millwork r/i. Phone #: ###-#### Inspection requested via web by Rafael Castillo 9th floor millwork covered prior to inspection remove nad recall. 8th floor office grid rough in ok cover
|
ELE16-01134
| Electrical Rough-In | 7/26/2016 | 7/27/2016 | 7/27/2016 12:00:00 AM | A | PASS |
|
|
We are requesting a 4th floor slab (north half) rough-in inspection for tomorrow morning. Our contact onsite is Bobby ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate Floors 4 thru 9 slabs just have sleeves and temp conduit. Areas noted slab rough in ok cover
|
ELE16-01512
| Final | 7/25/2016 | 7/27/2016 | 7/26/2016 9:29:49 AM | A | CANC |
|
|
2nd floor office space adjacent to new corridor Phone #: ###-#### >> Inspection requested via web by steve ragan Inspection cancelled from web by: steve ragan
|