Inspections for the day of: Wednesday, July 27, 2016.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00303 Electrical Rough-In7/27/20167/27/20167/27/2016 4:20:24 PMPPART
Ceiling cover inspection where available. Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
Grid as noted on contractor print for levels 2 and 3 rough in ok cover. areas not ready are 353, 358, 363, 221 240, 241, 242, 243, open area north side fixture whip.
ELE15-00495 Electrical Rough-In7/27/20167/27/20167/27/2016 4:15:51 PMPPART
TCO walk. Wall rough in for cover stair 4. Ceiling inspection cover first floor lobby. Contact Toby Groves ###-####. As late in the afternoon as possible for your schedule. Phone #: ###-#### Inspection requested via web by Toby Groves
Stair 4 floors 2 thru 5 wall rough in ok cover. 1st floor main lobby only and elevator lobby grid rough in ok cover
ELE16-01838 Electrical Rough-In7/27/20167/27/20167/27/2016 2:57:06 PMPPASS
Level 2 4 5 6 underfloor Furniture Conn. Phone #: ###-#### Inspection requested via web by Tom Betty
Spot check whip connection for furniture. Listing and rough in ok cover
ELE15-01348 Electrical Rough-In7/27/20167/27/20167/27/2016 2:51:18 PMPPASS
MDBCC Dist. and more EQ feeders and LS feeders level 5 thru 9
RDBB level 10 and VFD Cooling Towers and Controls
AHU 1,2,3 Feeders and other MDBCC equip Phone #: ###-#### Inspection requested via web by Tom Betty
Areas noted rough in ok cover and energize. furniture whip all have dedicated neutrals for each and all circuits.
Discussed door joining 2 electrical rms.
110.12(C)(2)(b)- If work depth is double only 1 door for egress is required however 2nd door exist and is within 25' from gear and shall open out of each room for egress or be removed.
ELE16-02161 Permanent Service7/26/20167/27/20167/27/2016 11:48:54 AMAFAIL
If you have any questions, please call Jared ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan
110.14- Dissimilar metals shall not be in contact with each other.
110.22- Each disconnecting means shall be identified as to it purpose.
ELE16-02160 Permanent Service7/26/20167/27/20167/27/2016 11:48:02 AMAFAIL
If you have any questions, please call Jared ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan
110.14- Dissimilar metals shall not be in contact with each other.
110.22- Each disconnecting means shall be identified as to it purpose.
ELE16-02159 Permanent Service7/26/20167/27/20167/27/2016 11:47:10 AMAFAIL
If you have any questions, please call Jared ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan
110.14- Dissimilar metals shall not be in contact with each other.
110.22- Each disconnecting means shall be identified as to it purpose.
ELE16-01823 Permanent Service7/26/20167/27/20167/27/2016 11:46:19 AMAFAIL
If you have any questions, please call Jared ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan
110.14- Dissimilar metals shall not be in contact with each other.
110.22- Each disconnecting means shall be identified as to it purpose.
ELE16-01946 Conference7/26/20167/27/20167/27/2016 10:53:10 AMADONE
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed work clearence for HVAC units in ceiling areas. Piping that has been installed limits access to control box on units. 110.26 requires 36" however where not possible less OK. Shall not be less than 18" clear access.
ELE15-03901 Electrical Rough-In7/26/20167/27/20167/27/2016 10:33:40 AMAPART
Call Pierce for inspection of 8th floor ceiling grid areas and 9th floor reception desk millwork r/i. Phone #: ###-#### Inspection requested via web by Rafael Castillo
9th floor millwork covered prior to inspection remove nad recall.
8th floor office grid rough in ok cover
ELE16-01134 Electrical Rough-In7/26/20167/27/20167/27/2016 12:00:00 AMAPASS
We are requesting a 4th floor slab (north half) rough-in inspection for tomorrow morning. Our contact onsite is Bobby ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate
Floors 4 thru 9 slabs just have sleeves and temp conduit. Areas noted slab rough in ok cover
ELE16-01512 Final7/25/20167/27/20167/26/2016 9:29:49 AMACANC
2nd floor office space adjacent to new corridor Phone #: ###-#### >> Inspection requested via web by steve ragan Inspection cancelled from web by: steve ragan