ELE18-02481
| Final | 7/27/2018 | 7/27/2018 | 7/27/2018 2:32:52 PM | A | PART |
|
|
Justin. Starbucks kiosk. Phone #: ###-#### Inspection requested via web by Sean DeLacy exhisting recep next to ice machine needs gfci protectio, circuit 15 gfci breaker test wont trip temp only ok
|
ELE18-01821
| Final | 7/27/2018 | 7/27/2018 | 7/27/2018 1:51:38 PM | P | PASS |
|
|
Any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Corrections made final ok
|
ELE18-02851
| Permanent Service | 7/27/2018 | 7/27/2018 | 7/27/2018 1:39:53 PM | P | PASS |
|
|
Service only Phone #: ###-#### Inspection requested via web by jamie berg p/s u/g n ok
|
ELE18-01982
| Final | 7/26/2018 | 7/27/2018 | 7/27/2018 1:16:15 PM | P | PASS |
|
|
garage code 1001e Phone #: ###-#### Inspection requested via web by Alan Lusk final ok
|
ELE18-00869
| Electrical Rough-In | 7/26/2018 | 7/27/2018 | 7/27/2018 12:14:21 PM | A | PASS |
|
|
Site UG Cover. Danny is onsite. Phone #: ###-#### Inspection requested via web by Buster Bowen UG ok to cover
|
ELE18-01533
| Final | 7/26/2018 | 7/27/2018 | 7/27/2018 12:13:34 PM | P | PART |
|
|
Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Open knock outs on cubicals, Hot, grnd reverse on cubicals. Motion sensor need removed in electrical room. Check panel schedules.
|
ELE18-01821
| Final | 7/25/2018 | 7/27/2018 | 7/27/2018 11:04:05 AM | A | FAIL |
|
|
Any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Need breaker lock on Water heater. Move recep for micro from behind ducting.
|
ELE18-02069
| Electrical Rough-In | 7/26/2018 | 7/27/2018 | 7/27/2018 9:34:00 AM | A | PASS |
|
|
Rough in inspection for the lobby tee grid ceilings Contact Pierre Elskamp Thank you Phone #: ###-#### Inspection requested via web by Tom Betty Lobby grid only ok to cover
|
ELE18-02814
| Final | 7/26/2018 | 7/27/2018 | 7/27/2018 9:33:22 AM | A | PASS |
|
|
Inspect a new GFCI 20A/ 120V circuit outside, for a plug-in hot tub.
I will be there at 8-830. Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta final ok
|
ELE18-02814
| Electrical Rough-In | 7/27/2018 | 7/27/2018 | 7/27/2018 9:33:22 AM | P | PASS |
|
|
Inspect a new GFCI 20A/ 120V circuit outside, for a plug-in hot tub.
I will be there at 8-830. Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Surface mount conduit to recep for hot tub only rough in ok
|
ELE18-02782
| Conference | 7/27/2018 | 7/27/2018 | 7/27/2018 7:52:57 AM | P | DONE |
|
|
Talked to owner about AFCI protection of added receps in bedroom, GFCI protection of receps in laundry room and bath vanity, tamper resistant receps through out. Owners Dad is helping wire the addition and has previous electrical experience.
|