MEC95-00046
| INSP - Final | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | | FAIL |
|
|
FAIL/20 MIN/$20.00 REINSPECTION FEE
|
MEC95-00046
| INSP - Final | 7/27/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | A | FAIL |
|
|
need to: insulate s.a. plenum, support s.a. run and kink pipe in crawl, vent dryer outdoors, and fix vent at furnace. 20 min.
|
MEC95-00053
| INSP - Final | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | A | PASS |
|
|
final ok 20 min
|
MEC3047544
| INSP - Conference | 7/27/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | A | PASS |
|
|
talked with superintent of job about why range hoods have to vent to the outside. 30 min
|
MEC3047544
| INSP - Final | 7/27/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | A | FAIL |
|
|
need to: fix range hoods to vent outdoors, and put length tags at dryers. 20 min
|
MEC3047579
| INSP - Framing/ Rough-in | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | A | FAIL |
|
|
no access to equipment in cellar. left notice. 20 min.
|
MEC95-00046
| INSP - Conference | 7/27/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | A | PASS |
|
|
went over corrections with builder. 15 min
|
MEC95-00347
| INSP - Gas pressure test | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | A | PASS |
|
|
#26190 gas line ok. 15 min.
|
MEC95-00347
| INSP - Framing/ Rough-in | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | A | FAIL |
|
|
need to: insulate s.a. plenum and transititon from furn. to a/c coil, and shorten poly tube from cond. pump outdoors. 20 min
|
MEC95-00354
| INSP - Gas pressure test | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | PASS |
|
|
gas test ok #26189 15 min
|
MEC95-00354
| INSP - Framing/ Rough-in | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | PASS |
|
|
furn-w/h ok 20 min
|
MEC95-00354
| INSP - Final | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | PASS |
|
|
final ok 10 min
|
MEC95-00356
| INSP - Framing/ Rough-in | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | FAIL |
|
|
take metal flex off exhaust fans and fix b-vent above roof. 20 min
|
MEC95-00356
| INSP - Conference | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | PASS |
|
|
talked to hvac installer about corrections. 20 min
|
MEC95-00164
| INSP - Final | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | FAIL |
|
|
need to insulate boots and parts of main trunk line. 20 min.
|
MEC95-00327
| INSP - Gas pressure test | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | FAIL |
|
|
couldn't find a gas test and there was no access to the house. 15 min
|
MEC95-00338
| INSP - Framing/ Rough-in | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | PASS |
|
|
r/i ok. 10 min
|
MEC95-00338
| INSP - Gas pressure test | 7/28/1995 | 7/28/1995 | 7/28/1995 12:00:00 AM | P | PASS |
|
|
unions in gas line sealed with lock tight and pressure ok 20 min
|