BLD96-02635
| INSP - Temporary occupancy | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | | PART |
|
|
/ / 342 - will complete cabo/ansi requirements as noted on plans after requirements for a pocket door and bath accessories heighth...
|
BLD97-01033
| INSP - Carpentry | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | | PART |
|
|
/ / 342 - finishing shear, truss eng, installing windows, pt lds, stai
|
BLD97-01033
| INSP - Conference | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | | PART |
|
|
/ / 342 - talked to builder, will meet framers on site
|
BLD97-02163
| INSP - Final | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | | FAIL |
|
|
/ / 342 - egress window well greater than 44" in depth, no access, no
|
BLD97-02163
| INSP - Final | 7/25/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | A | NH |
|
|
07/28/97 342 - off orchard and irving
|
BLD97-01968
| INSP - Wall cover | 7/25/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | A | PASS |
|
|
07/28/97 342 - rebar for the walls 10: or 10:30 ...settig bds, asked for
|
BLD97-01978
| INSP - Foundation | 7/25/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | A | PASS |
|
|
07/28/97 342 -
|
BLD97-00371
| INSP - Framing/Rough-in | 7/25/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | A | FAIL |
|
|
07/28/97 342 - hold downs not installed correctly, hangers not installed struts not to plan
|
MEC97-01972
| INSP - Gas log/ Fireplace | 7/25/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | A | NH |
|
|
07/28/97 342 -
|
MEC97-02010
| INSP - Pool heaters | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | P | NR |
|
|
07/28/97 342 - no specs on site, will recall with c/o final and have spe
|
MEC97-00615
| INSP - Final | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | P | FAIL |
|
|
07/28/97 342 - exposed celotex, range nor range hood on site
|
MEC97-00615
| INSP - Final | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | P | FAIL |
|
|
07/28/97 342 - exposed celotex, range nor range hood on site
|
BLD97-01033
| INSP - Framing/Rough-in | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | P | NR |
|
|
07/28/97 342 - met framers on site, still finishing
|
BLD96-02635
| INSP - Final | 7/28/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | P | FAIL |
|
|
07/28/97 342 - ck cabo/ansi pocket door requirements, bathrooms, and nee
|
BLD97-01088
| INSP - Final | 7/25/1997 | 7/28/1997 | 7/28/1997 12:00:00 AM | P | NH |
|
|
07/28/97 342 -
|