BLD03-00973
| BLD-Footing | 7/24/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 7/24/2003 at 4:26:11 PM. Contact: ###-####.
|
MEC03-01960
| Pressure Test | 7/25/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 11:24:42 AM. Contact: ###-####....previously tagged by 350 7/28/2003 10:28:09 AM
|
BLD03-00613
| BLD-Final | 7/25/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | A | PASS |
|
|
Please call half hour prior to inspect//matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD02-00370
| BLD-Conference | 7/25/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | A | PART |
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows carl out of time fri. rolled this over for monday. 301..ok, awaiting eng's call for shear walls, !HR CONST IS REQ'D 7/28/2003 11:34:43 AM
|
BLD02-00370
| BLD-Framing/Rough-in | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 8:48:23 AM. ...reviewed proposal for p-traps: fill under tub w/ gyp-crete & firestop ABS pipe penetration at floor line from bottom per listing & T-7-C UBC. 7/29/2003 1:47:08 PM
|
BLD02-00370
| BLD-Framing/Rough-in | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD02-00369
| BLD-Framing/Rough-in | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | PART |
|
|
Pete, reviewed c/ns...wip 7/28/2003 4:28:08 PM
|
BLD02-00199
| BLD-Conference | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | PASS |
|
|
Randy ###-####...need plbg penetrations ok'd for 3hr deck...pvc/cast?? w pro set sleeves 7/28/2003 4:27:26 PM
|
BLD01-02821
| BLD-Conference | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | PASS |
|
|
CARL, CALL TONY,###-####...chk to see if owner has card...P&Z??? structural ok 7/28/2003 1:13:34 PM
|
BLD03-00830
| BLD-Final | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | FAIL |
|
|
###-####...c/n, n/r... 7/28/2003 3:21:34 PM
|