Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00830 FIRE-Final Inspection7/28/20037/28/20037/29/2003 12:00:00 AMPFAIL
###-#### not a final; verified insulation in two cavities - okay to cover - area by main entry at dance floor extension and on stage on second floor 7/29/2003 5:06:29 PM
MIS03-00146 FIR-Final7/28/20037/28/20037/28/2003 12:00:00 AMPPASS
###-#### john
FIR03-00332 INSP-Alarm Testing7/25/20037/28/20037/28/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 7/25/2003 at 2:05:16 PM. Contact: ###-####.
BLD03-00335 FIRE-Final Inspection7/25/20037/28/20037/28/2003 12:00:00 AMPPASS
martin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIR03-00079 INSP-Final Inspection7/28/20037/28/20037/28/2003 12:00:00 AMPFAIL
need smoke above panel; replace ceiling in FACP room 7/29/2003 7:34:14 AM
FIR03-00323 INSP-Final Inspection7/28/20037/28/20037/28/2003 12:00:00 AMPFAIL
Rick, This is one of the two projects that we spoke about this morning. They are right next to each other in the Blackeagle complex. Troy only had three comments for each building. 1.) Provide 18AH Batteries, 2.) Provide sinage on the riser room door, and 3.) provide definitions of the zones at the monitoring service. I will call you around noon to verify if you will have time this afternoon to final these out. Thanks, Jason Minnick c-###-####; Phone #: ###-#### Internet Inspection Request from: Jason Minnick Supervisory came in as trouble; phone line came in as water flow trouble 7/28/2003 3:00:57 PM
FIR03-00348 INSP-Final Inspection7/28/20037/28/20037/28/2003 12:00:00 AMPNR
Rick, This is other of the two projects that we spoke about this morning. They are right next to each other in the Blackeagle complex. Troy only had three comments for each building. 1.) Provide 18AH Batteries, 2.) Provide sinage on the riser room door, and 3.) provide definitions of the zones at the monitoring service. I will call you around noon to verify if you will have time this afternoon to final these out. Thanks, Jason Minnick c-###-####; Phone #: ###-#### Internet Inspection Request from: Jason Minnick; Phone #: ###-#### Internet Inspection Request from: Jason Minnick didn't test this system as this had the same problem as 9149 Blackeagle 7/28/2003 3:11:34 PM
FIR02-00477 INSP-Sprinkler Rough-in/Hydro7/28/20037/28/20037/28/2003 12:00:00 AMPPART
Please call 1 hour before inspection so we can set at 200lbs. Thank you ; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro on 3rd floor mezz okay; will continue rough in tomorrow 7/28/2003 3:32:26 PM