BLD03-00830
| FIRE-Final Inspection | 7/28/2003 | 7/28/2003 | 7/29/2003 12:00:00 AM | P | FAIL |
|
|
###-#### not a final; verified insulation in two cavities - okay to cover - area by main entry at dance floor extension and on stage on second floor 7/29/2003 5:06:29 PM
|
MIS03-00146
| FIR-Final | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | PASS |
|
|
###-#### john
|
FIR03-00332
| INSP-Alarm Testing | 7/25/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 2:05:16 PM. Contact: ###-####.
|
BLD03-00335
| FIRE-Final Inspection | 7/25/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | PASS |
|
|
martin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIR03-00079
| INSP-Final Inspection | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | FAIL |
|
|
need smoke above panel; replace ceiling in FACP room 7/29/2003 7:34:14 AM
|
FIR03-00323
| INSP-Final Inspection | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | FAIL |
|
|
Rick, This is one of the two projects that we spoke about this morning. They are right next to each other in the Blackeagle complex. Troy only had three comments for each building. 1.) Provide 18AH Batteries, 2.) Provide sinage on the riser room door, and 3.) provide definitions of the zones at the monitoring service. I will call you around noon to verify if you will have time this afternoon to final these out. Thanks, Jason Minnick c-###-####; Phone #: ###-#### Internet Inspection Request from: Jason Minnick Supervisory came in as trouble; phone line came in as water flow trouble 7/28/2003 3:00:57 PM
|
FIR03-00348
| INSP-Final Inspection | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | NR |
|
|
Rick, This is other of the two projects that we spoke about this morning. They are right next to each other in the Blackeagle complex. Troy only had three comments for each building. 1.) Provide 18AH Batteries, 2.) Provide sinage on the riser room door, and 3.) provide definitions of the zones at the monitoring service. I will call you around noon to verify if you will have time this afternoon to final these out. Thanks, Jason Minnick c-###-####; Phone #: ###-#### Internet Inspection Request from: Jason Minnick; Phone #: ###-#### Internet Inspection Request from: Jason Minnick didn't test this system as this had the same problem as 9149 Blackeagle 7/28/2003 3:11:34 PM
|
FIR02-00477
| INSP-Sprinkler Rough-in/Hydro | 7/28/2003 | 7/28/2003 | 7/28/2003 12:00:00 AM | P | PART |
|
|
Please call 1 hour before inspection so we can set at 200lbs. Thank you ; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro on 3rd floor mezz okay; will continue rough in tomorrow 7/28/2003 3:32:26 PM
|