ELE09-00068
| ELE-Aging Inspection | 7/28/2009 | 7/28/2009 | 7/31/2009 4:00:20 PM | | DONE |
|
|
no activity, waiting for contractor to set up meeting for inspection
|
ELE09-00717
| ELE-Aging Inspection | 7/28/2009 | 7/28/2009 | 7/31/2009 3:58:24 PM | | DONE |
|
|
no activity, waiting for contractor
|
ELE09-00176
| ELE-Aging Inspection | 7/28/2009 | 7/28/2009 | 7/31/2009 3:57:06 PM | | DONE |
|
|
no activity, waiting for contractor
|
ESC09-00389
| General Inspection | 7/28/2009 | 7/28/2009 | 7/28/2009 4:28:19 PM | P | PART |
|
|
called 315 and 360, assigned inspection to 360
|
ESC09-00398
| General Inspection | 7/28/2009 | 7/28/2009 | 7/28/2009 4:27:25 PM | P | PART |
|
|
called 315 and 360, assigned inspection request to 360
|
ELE08-02536
| Electrical Rough-In | 7/28/2009 | 7/28/2009 | 7/28/2009 4:19:27 PM | P | PART |
|
|
Requesting a partial ceiling inspection to cover. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ceilings ok to cover music room and south c wing except dental area anop
|
ESC08-00457
| General Inspection | 7/28/2009 | 7/28/2009 | 7/28/2009 3:42:55 PM | P | PASS |
|
|
looked ok
|
ESC09-00332
| General Inspection | 7/28/2009 | 7/28/2009 | 7/28/2009 3:19:49 PM | P | PASS |
|
|
looked ok
|
ESC09-00433
| General Inspection | 7/28/2009 | 7/28/2009 | 7/28/2009 3:00:30 PM | P | PASS |
|
|
looked ok
|
ELE09-01354
| Electrical Rough-In | 7/28/2009 | 7/28/2009 | 7/28/2009 1:55:04 PM | P | PASS |
|
|
lars Phone #: ###-#### corrections made, ric 2 east units only ok
|
ELE09-01264
| Final | 7/28/2009 | 7/28/2009 | 7/28/2009 12:44:35 PM | P | PASS |
|
|
wire new A/C unit everthing on outside, any questions please call Rob @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose called contractor, ok to final, no esc this project
|
ELE09-01264
| Electrical Rough-In | 7/28/2009 | 7/28/2009 | 7/28/2009 12:33:31 PM | P | PASS |
|
|
wire new A/C unit everthing on outside, any questions please call Rob @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose called, ric ok, no esc this project
|
ELE09-01362
| Final | 7/27/2009 | 7/28/2009 | 7/28/2009 10:19:12 AM | A | PASS |
|
|
ext 1-chris-please call at least 30 mins prior to inspection Phone #: ###-#### ok to final, no esc this project
|
ELE09-01362
| Electrical Rough-In | 7/28/2009 | 7/28/2009 | 7/28/2009 10:16:14 AM | A | PASS |
|
|
ext 1-chris-please call at least 30 mins prior to inspection Phone #: ###-#### u/g ok to cover pole to house, no esc this project
|
ELE09-01349
| Electrical Rough-In | 7/27/2009 | 7/28/2009 | 7/28/2009 9:46:07 AM | A | PASS |
|
|
finishing the basement Phone #: ###-#### Internet Inspection Request from: Stephen Kren ric ok, no esc this project
|
ELE09-01365
| Electrical Rough-In | 7/27/2009 | 7/28/2009 | 7/28/2009 8:54:23 AM | A | PASS |
|
|
Reguest electrical rough-in on addition. Phone #: ###-#### Internet Inspection Request from: Tim Lawrence called, ric ok
|
ELE09-01354
| Electrical Rough-In | 7/27/2009 | 7/28/2009 | 7/28/2009 8:12:49 AM | A | FAIL |
|
|
Lars Phone #: ###-#### called, left correction notice, NEC 300.4(A)(1) edge of bored holes shall be 1 1/4" from edge of framing members or use steel plates for protection, 210.52(A)(1) receptacles shall be spaced such that no point along wall line is over 6' from an outlet, 250.24(A) grounded conductor shall be connected to grounding electrode at service only, 348.30 fmc shall be securely fastened within 12" of box, BCC shall provide boxes for nm termination points, no violations shall be retained
|
ELE09-01349
| Electrical Rough-In | 7/27/2009 | 7/28/2009 | 7/27/2009 3:19:06 PM | P | CANC |
|
|
cust is finishing the basement Phone #: ###-#### Internet Inspection Request from: Stephen Kren Inspection cancelled from web by: Stephen Kren
|