Inspections for the day of: Tuesday, July 28, 2009.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00290 INSP-Final Inspection7/24/20097/28/20097/29/2009 5:11:26 PMPPART
See notes 7/29
BLD07-00060 FIRE-Final Inspection7/28/20097/28/20097/29/2009 1:18:36 PMPPASS
Fire life safety inspection passed.
FIR09-00033 INSP-Sprinkler Rough-in/Hydro7/21/20097/28/20097/29/2009 1:17:49 PMAPART
Continuing rough in inspections and hydro tests. Please call with time frames. Phone #: ###-#### Internet Inspection Request from: Jeff Packham
BLD09-00301 FIRE-Final Inspection7/27/20097/28/20097/29/2009 7:34:41 AMPPASS
Fire life safety finaled.
FIR09-00279 INSP-Final Inspection7/27/20097/28/20097/28/2009 3:16:18 PMPPASS
Fire sprinkler permit okay for final per site visit done 7/23 for project related fire alarm test and phase two life safety inspection.
BLD08-01575 FIRE-Final Inspection7/28/20097/28/20097/28/2009 3:12:26 PMPDONE
Scheduled by a contractor via Hello! on 7/28/2009 at 8:36:19 AM. Contact: ###-####. Notified contractor that no fire signatures are required per permit details.
BLD09-00816 FIRE-Final Inspection7/28/20097/28/20097/28/2009 3:10:54 PMPPASS
Fire life safety for the tenant remodel area is acceptable, fire sprinkler spacing remains compliant.
BLD09-01222 FIRE-Final Inspection7/27/20097/28/20097/28/2009 3:08:47 PMPPASS
Life safety inspection passed.
FIR08-00720 INSP-Final Inspection7/28/20097/28/20097/28/2009 1:45:25 PMPCANC
Troy, Can we set this up for 3:00ish? Please call me as soon as you may know, so that I can set up the sprinkler guys. Thanks, Jason ###-#### Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
BLD09-00871 FIRE-Final Inspection7/28/20097/28/20097/28/2009 1:30:48 PMPFAIL
Door hardware at the west office needs reversed, need to post fire extinguishers within allowable travel distances, project attatched fire sprinkler permit is not ready for final at this time.
FIR09-00432 INSP-Final Inspection7/28/20097/28/20097/28/2009 1:28:36 PMPFAIL
Missing ceiling tile at the new conference room, final pending finishes.
BLD09-01227 FIRE-Final Inspection7/28/20097/28/20097/28/2009 1:26:35 PMPPASS
Items on correction notice field verified for compliance, life safety passed.
BLD09-01225 FIRE-Final Inspection7/27/20097/28/20097/28/2009 11:24:20 AMAPASS
Life safety is acceptable, kitchen equipment is not yet installed- owner to provide K class fire extinguisher as discussed at the location indicated when installation is complete and prior to operation.
FIR09-00439 INSP-Final Inspection7/27/20097/28/20097/28/2009 11:20:21 AMADEFR
Greg Phone #: ###-#### Inspection rescheduled per conversation with contractor.
BLD09-00769 FIRE-Final Inspection7/27/20097/28/20097/28/2009 11:18:48 AMANR
Noted project related fire alarm permit FIR09-00439 has not been inspected or finaled per activity notes. Per conversation with contractor this work has been tested on a previous permit, inspection defered for verification by T. Cobbley as agreed.
BLD09-01128 FIRE-Final Inspection7/27/20097/28/20097/28/2009 11:12:24 AMAPASS
Fire life safety inspection completed satisfactory.
FIR09-00445 INSP-Final Inspection7/27/20097/28/20097/28/2009 11:11:03 AMAPASS
Fire sprinkler work passed final inspection, permit finaled.
BLD09-00173 FIRE-Final Inspection7/23/20097/28/20097/28/2009 11:10:00 AMAFAIL
Missing door hardware at various locations, shell building permit needs called for final, project related fire sprinkler permit must be requested for inspection and finaled prior to tenant life safety approval, noted missing signage and valve locks at the DCVA serving the fire sprinkler piping, discussed fire code review notes and general requirements.