BLD09-01637
| BLD-Aging Inspection | 7/28/2010 | 7/28/2010 | 8/3/2010 4:03:51 PM | P | DONE |
|
|
|
BLD08-00873
| FIRE-Final Inspection | 7/27/2010 | 7/28/2010 | 7/29/2010 3:59:35 PM | P | NR |
|
|
Intended for an on site conference regarding fire life safety requirements. Discussion with contractor regarding exit signs, emergency lighting, door hardware, fire extinguishers, scope of permit work, occupant load signs, etc. Approved plans were not available on site for review. Advised contractor to also consult the attatched fire code review notes for details as well.
|
BLD10-01205
| FIRE-Conference | 7/28/2010 | 7/28/2010 | 7/29/2010 3:54:39 PM | P | DONE |
|
|
Regarding project related fire alarm permit work.
|
FIR10-00295
| INSP-Sprinkler Rough-in | 7/28/2010 | 7/28/2010 | 7/28/2010 2:31:00 PM | P | PART |
|
|
Overhead work at the first floor lobby grid ceiling east side (3 pendents) is approved for cover.
|
BLD09-01403
| FIRE-Final Inspection | 7/16/2010 | 7/28/2010 | 7/28/2010 12:20:42 PM | A | FAIL |
|
|
Phoned contact and no answer- left message. No one on site and the building was locked at the time of site visit. Noted missing address numbers, wall post indicator for the fire sprinkler system is dislodged. Need access and permit documents to complete inspection.
|
FIR10-00079
| INSP-Final Inspection | 7/28/2010 | 7/28/2010 | 7/28/2010 12:14:20 PM | A | PASS |
|
|
Scope of fire alarm work passed inspection and testing, permit finaled.
|
FIR09-00504
| INSP-Final Inspection | 7/22/2010 | 7/28/2010 | 7/28/2010 12:13:21 PM | A | PASS |
|
|
Fire alarm work passed functional testing. Permit final approved. Discussed signage at the generator EMO buttons.
|