BLD11-00141
| BLD-Final | 7/22/2011 | 7/28/2011 | 8/3/2011 4:02:46 PM | A | PEND |
|
|
Doug please call 30 min before going out Phone #: ###-####
|
BLD08-01270
| BLD-Framing/Rough-in | 7/28/2011 | 7/28/2011 | 7/29/2011 12:22:38 PM | P | PART |
|
|
dan Phone #: ###-####,, utility room frame,, partial,,, need trades signed off on rough 1st,, ok to insulate walls,, conference on other framing in other parts ofthe house
|
BLD11-01768
| BLD-Conference | 7/28/2011 | 7/28/2011 | 7/29/2011 9:55:55 AM | P | PART |
|
|
Gary..; Phone #: ###-####,, with contractor and housing rep, Gary,, on roof to verify and call out some fixes/replacments of damaged decking and joists
|
BLD11-00416
| BLD-Conference | 7/28/2011 | 7/28/2011 | 7/29/2011 9:35:29 AM | P | PASS |
|
|
take C. Westfall,, walk through
|
BLD11-01521
| BLD-Footing | 7/28/2011 | 7/28/2011 | 7/28/2011 5:00:38 PM | P | PART |
|
|
request asap//Tim Phone #: ###-####,, point loads under floor,, work in progress
|
BLD11-01610
| BLD-Foundation | 7/27/2011 | 7/28/2011 | 7/28/2011 4:48:02 PM | P | PASS |
|
|
Tim Phone #: ###-####
|
BLD11-00416
| BLD-Conference | 7/27/2011 | 7/28/2011 | 7/28/2011 4:11:56 PM | A | PASS |
|
|
take C. Westfall,, walk through,,, GACR
|
BLD11-00786
| BLD-Final | 7/27/2011 | 7/28/2011 | 7/28/2011 1:01:56 PM | A | PASS |
|
|
vince Phone #: ###-#### - please call for access
|
BLD11-01593
| BLD-Concrete | 7/27/2011 | 7/28/2011 | 7/28/2011 11:45:04 AM | A | PART |
|
|
Rebar--miles Phone #: ###-####,, almost done on retaining wall,, ok
|
ESC11-00476
| Site Preparation | 7/27/2011 | 7/28/2011 | 7/28/2011 11:17:11 AM | A | PASS |
|
|
|
ESC11-00461
| Site Preparation | 7/27/2011 | 7/28/2011 | 7/28/2011 8:56:43 AM | A | PASS |
|
|
|