FIR13-00557
| INSP-Final Inspection | 7/25/2014 | 7/28/2014 | 7/28/2014 3:51:35 PM | A | FAIL |
|
|
Ssytm did not function properly, pre-sction devices not triping fire sprinkler.
|
FIR13-00612
| INSP-Supply line flush | 7/25/2014 | 7/28/2014 | 7/28/2014 3:49:21 PM | A | FAIL |
|
|
System is not installed per plan. Plan Mod may be needed.
|
BLD13-01049
| FIRE-Final Inspection | 7/28/2014 | 7/28/2014 | 7/28/2014 2:56:10 PM | P | PASS |
|
|
Pass
|
BLD13-01048
| FIRE-Final Inspection | 7/28/2014 | 7/28/2014 | 7/28/2014 2:55:21 PM | P | PASS |
|
|
|
BLD14-01742
| FIRE-Final Inspection | 7/28/2014 | 7/28/2014 | 7/28/2014 1:58:37 PM | P | PASS |
|
|
exit signs and bug eyes added
|
BLD14-01563
| FIRE-Final Inspection | 7/28/2014 | 7/28/2014 | 7/28/2014 1:27:19 PM | P | PASS |
|
|
racks are sprinkled. inspection pass.
|
BLD14-00714
| FIRE-Final Inspection | 7/28/2014 | 7/28/2014 | 7/28/2014 1:26:13 PM | P | PASS |
|
|
pass, no corrections required. racking inspected and pass for fire, bld14-01563
|
FIR13-00612
| INSP-Sprinkler Rough-in | 7/25/2014 | 7/28/2014 | 7/28/2014 12:48:45 PM | A | PASS |
|
|
Ok to cover. flush still needs to be done.
|
FIR14-00269
| INSP-Sprinkler Rough-in | 7/25/2014 | 7/28/2014 | 7/28/2014 12:48:04 PM | A | PASS |
|
|
all areas have been inspected and passed for rough in cover. Hydro done and pass.
|
FIR14-00210
| INSP-Alarm Testing | 7/25/2014 | 7/28/2014 | 7/28/2014 11:50:39 AM | A | PART |
|
|
This was for a the surgery area and waiting room. strobes and chimes pass. partial until rest of area gets completed.
|
FIR14-00191
| INSP-Sprinkler Rough-in | 7/25/2014 | 7/28/2014 | 7/28/2014 10:48:51 AM | A | PART |
|
|
Underground, west side of building, OK to cover
|
FIR14-00420
| INSP-Sprinkler Rough-in | 7/25/2014 | 7/28/2014 | 7/28/2014 10:27:28 AM | A | PART |
|
|
Building #5 underground rough in pass.
|
FIR14-00274
| INSP-Final Inspection | 7/25/2014 | 7/28/2014 | 7/28/2014 12:00:00 AM | A | FAIL |
|
|
System is not functioning correctly, not tied into the pre-action valves. Morgan states he needs to do a plan Mod so that more relays can be added.
|