ESC14-00865
| General Inspection | 7/28/2015 | 7/28/2015 | 7/29/2015 11:55:46 AM | | PASS |
|
|
WIP on painting Spectrum renovated buildings. New landscaping, curbing, and earthwork is complete. Will need to clean up staging area and remove DI bags in parking lot before closing permit. No corrections at this time.
|
ESC13-01159
| General Inspection | 7/24/2015 | 7/28/2015 | 7/29/2015 11:53:09 AM | A | PEND |
|
|
Corrections needed:
1. Post SWPPP and City of Boise ESC permit sign. 2. Install perimeter wattles at Heritage and Hiawatha after sweeping up loose dirt 3. Check and service all DI bags 4. Submit updated SWPPP and change permit responsibility if Trilogy is handing over CGP to CBH
|
ESC13-00520
| General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 4:35:27 PM | | CANC |
|
|
|
ESC13-00707
| General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 4:35:09 PM | | CANC |
|
|
|
ESC14-01063
| General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 4:34:57 PM | | PART |
|
|
Work still needs to be done to clean up Bent Bow. All inlets need to be emptied, only about 50% were serviced. WIP on corrections. No new corrections.
|
ESC14-01120
| Site Final | 7/28/2015 | 7/28/2015 | 7/28/2015 3:30:46 PM | P | PASS |
|
|
Home complete, landscaped, and occupied. No loose sediment leaving site, no building materials. ESC permit finaled.
|
ESC15-00882
| Random Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 3:14:38 PM | P | FAIL |
|
|
No discharges or significant track out but work has started without BMPs installed.
Verbal Correction request to RP M. Jobes to install DI bag and perimeter wattles.
|
ESC15-00957
| Site Preparation | 7/28/2015 | 7/28/2015 | 7/28/2015 3:06:14 PM | P | PASS |
|
|
Permit sign posted at entrance, SWPPP and NOI onsite.
Some initial grubbing and outbuilding demolition has occured. No fugitive dust observed. Initial BMPs installed. Will need to add material storage area and concrete washout for curb work.
Approved to excavate.
|
ESC15-00851
| General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 10:40:11 AM | A | PASS |
|
|
Ann Morrison soccer field re-grading and turf installation is in progress. Turf from Basque friendly is now on Field #3 and is surrounded by security fence and already inhabited by geese. A stockpile of sand in adjacent parking lot should be removed and area swept.
Now Precision grading is working on leveling #4. No trackout from work entrance, no fugitive dust issues, permit sign is posted.
Approved.
|
ESC15-00957
| Site Preparation | 7/27/2015 | 7/28/2015 | 7/28/2015 10:25:45 AM | A | PEND |
|
|
re-scheduled for PM ride-along
|
ESC14-00438
| General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 8:58:49 AM | | PASS |
|
|
|