FIR15-00751
| INSP-Conference | 7/27/2016 | 7/28/2016 | 7/28/2016 7:33:38 PM | A | DONE |
|
|
Fire alarm conference complete, tested smoke detectors associated with shell and core on levels 1 through 9, tested audio visual devices associated with shell and core on floors 1 through 9, tested loss of battery power trouble at main panel.
|
BLD15-03767
| FIRE-Final Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 3:28:22 PM | P | PASS |
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIR16-00069
| INSP-Final Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 3:25:46 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00449
| INSP-Sprinkler Rough-in | 7/26/2016 | 7/28/2016 | 7/28/2016 3:24:50 PM | P | PASS |
|
|
Rough to cover inspection for underground supply complete, underground supply approved for cover.
|
FIR16-00321
| INSP-Final Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 3:23:52 PM | P | FAIL |
|
|
Tank actuator did not operate when clean agent fire panel was in alarm. Contractor will troubleshoot and reschedule inspection request when issue is resolved.
|
FIR16-00114
| INSP-Final Inspection | 7/27/2016 | 7/28/2016 | 7/28/2016 3:20:17 PM | P | PASS |
|
|
Final fire sprinkler inspection for level 3 complete.
|
FIR16-00200
| INSP-Sprinkler Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 3:18:40 PM | A | PART |
|
|
24 hour air test started at 1:15pm @ 42psi
|
FIR16-00344
| INSP-Sprinkler Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 11:59:06 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping located above ceiling grid area's complete, overhead fire sprinkler piping located above ceiling grid area's from middle of tenant space north approved for cover.
|
FIR16-00305
| INSP-Sprinkler Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 11:30:49 AM | A | PART |
|
|
Partial rough to cover inspection for overhead fire sprinkler piping located on level 3 complete, notated the city approved drawings with pink highlighter/red ink area's approved for cover.
|
BLD16-01567
| FIRE-Final Inspection | 7/27/2016 | 7/28/2016 | 7/28/2016 10:57:53 AM | A | PASS |
|
|
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Noted that the general contractor was informed about the thumbturn deadbolts need to be changed, allowed one double keyed deadbolt and single action paddle type door hardware on other exterior door. Final life fire safety inspection passed/complete.
|
FIR15-00808
| INSP-Sprinkler Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 10:36:52 AM | A | PASS |
|
|
Tenting inspection complete for level 3, all overhead fire sprinkler piping located in the attic space of level 3 approved for cover.
|
BLD16-01910
| FIRE-Conference | 7/27/2016 | 7/28/2016 | 7/28/2016 10:17:41 AM | A | DONE |
|
|
Fire conference complete, tenant will need to contact a licensed contractor to perform a site survey for relocation/addition of exit signs and obstructed audio visual devices on the fire alarm system that is now blocked by the newly installed racks. Any work performed on the fire alarm system will require an FIR permit for work to be completed.
|
FIR16-00129
| INSP-Final Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 9:43:37 AM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete
|
FIR16-00155
| INSP-Sprinkler Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 9:36:52 AM | P | PART |
|
|
Rough to cover inspection complete for 4th floor south bathrooms, south 4th floor bathrooms approved for cover.
|
FIR15-00795
| INSP-Final Inspection | 7/27/2016 | 7/28/2016 | 7/28/2016 8:58:14 AM | P | CANC |
|
|
Please call Jake when you are headed out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|