Inspections for the day of: Tuesday, July 28, 2020.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR20-00151 INSP-Final Inspection7/28/20207/28/20207/28/2020 3:07:40 PMPCANC
Anytime after 1:30 pm please Phone #: ###-#### Inspection requested via web by Matt Casey
FIR19-00785 INSP-Final Inspection7/27/20207/28/20207/28/2020 3:07:09 PMPCANC
Waiting on fire alarm interconnect. Need backflow verified and pressure relief valves.
Tanner - */Screened*/ Phone #: ###-####
BLD20-01078 FIRE-Final Inspection7/28/20207/28/20207/28/2020 11:33:55 AMPPASS
Life safety passed.

Call for access lockbox on door. Dwayne- */Screened*/ *jobsite is vacant Phone #: ###-####
BLD20-01260 FIRE-Conference7/27/20207/28/20207/28/2020 10:33:50 AMADONE
Myself, the general contractor, sprinkler contractor and fire alarm contractor went over various requirements for final sign offs. I noted that the fire protection systems in the vacant side of the building will need to be code compliant and operational prior to any final sign offs.\
Jerimih *screened* Phone #: ###-####
BLD20-01836 FIRE-Final Inspection7/27/20207/28/20207/28/2020 9:20:07 AMAPASS
Life safety passed. Repair or remove non-functional exit sign and repair the two interior signs prior to a building inspection.

SCREENED... CALL 30 MINUTES BEFORE // Lloyd Phone #: ###-####
FIR20-00074 INSP-Sprinkler Rough-in7/27/20207/28/20207/28/2020 9:17:48 AMAPASS
Sprinkler piping in the southwest corner of the building ok for cover. Rick- */Screened*/ Phone #: ###-####
FIR20-00357 INSP-Sprinkler Rough-in7/22/20207/28/20207/23/2020 2:42:37 PMPCANC
Contact Scott Carter III ###-#### 30 min prior to RTC insp start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank