Inspections for the day of: Monday, July 29, 1996.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD96-01164 INSP - Energy code compliance7/25/19967/29/19967/29/1996 12:00:00 AMAPASS
8:30am per conversation with Wes W.
BLD96-01145 INSP - Framing/Rough-in7/26/19967/29/19967/29/1996 12:00:00 AMANR
still has wood in structure in front of remodel area, maint rm ok
BLD96-01507 INSP - Footings7/26/19967/29/19967/29/1996 12:00:00 AMANR
EARLY A.M. MONDAY ck setbk lines, remove organic matter, dig down to plan depth
BLD96-01145 INSP - Conference7/29/19967/29/19967/29/1996 12:00:00 AMPPART
BLD96-01164 INSP - Framing/Rough-in7/29/19967/29/19967/29/1996 12:00:00 AMPPART
BLD96-01164 INSP - Conference7/29/19967/29/19967/29/1996 12:00:00 AMPFAIL
rejecting items 2 and 3. not per ubc or tji criteria
BLD96-01164 INSP - Carpentry7/29/19967/29/19967/29/1996 12:00:00 AMPFAIL
point load not transferred correctly, tji installed wrong
BLD95-00241 INSP - Framing/Rough-in7/29/19967/29/19967/29/1996 12:00:00 AMPPART
corridor wall ok
BLD96-00482 INSP - Letter of compliance7/29/19967/29/19967/29/1996 12:00:00 AMPPASS
-
BLD96-00482 INSP - Letter of compliance7/29/19967/29/19967/29/1996 12:00:00 AMPPASS
-
BLD96-00482 INSP - Final7/29/19967/29/19967/29/1996 12:00:00 AMPPASS
BLD96-00519 INSP - Footings7/29/19967/29/19967/29/1996 12:00:00 AMPFAIL
rebar in dirt, dobbie and chairs placed wrong, embedded wood, ck compaction, remove material from ftg bottom
BLD96-00884 INSP - Conference7/29/19967/29/19967/29/1996 12:00:00 AMPPART
called Tom Cory to visit sight and transfer ld brng wall as per tji installation criteria
BLD96-00884 INSP - Carpentry7/29/19967/29/19967/29/1996 12:00:00 AMPPART
transfer ld as per tji criteria and do tji eng as per Tom Cory
BLD96-01145 INSP - Carpentry7/29/19967/29/19967/29/1996 12:00:00 AMPFAIL