PLM95-01651
| INSP - Final | 7/26/1996 | 7/29/1996 | 7/29/1996 12:00:00 AM | A | PART |
|
|
07/29/96 347 - room 122 and 124 FINAL ON F/D ONLY, THAT IS ALL THEY WER
|
PLM95-01651
| INSP - Plumbing Rough-in | 7/26/1996 | 7/29/1996 | 7/29/1996 12:00:00 AM | A | PART |
|
|
07/29/96 347 - R/I O/K 7/29/6 347 RMS 115, 117, 121, 123
|
PLM96-02116
| INSP - Plumbing Rough-in | 7/26/1996 | 7/29/1996 | 7/29/1996 12:00:00 AM | A | FAIL |
|
|
07/29/96 347 - UPC 318 NO TEST ON WATER PIPING P/B REQUIRES 150# NO TST ON DRAINS UPC 614 C.O. REQUIRED IN VERTICAL OF FOOT VENT (KS) UPC 613 (B) VERTICAL WET VENTING SHALL NOT SMA
|
PLM96-02196
| INSP - Conference | 7/29/1996 | 7/29/1996 | 7/29/1996 12:00:00 AM | P | PART |
|
|
SHE WILL CALL TO SET TIME
|
PLM96-01784
| INSP - Final | 7/29/1996 | 7/29/1996 | 7/29/1996 12:00:00 AM | P | PASS |
|
|
07/29/96 347 - W/C 2 BASIN 3 TTUB 1 SHR 1 SINK 1 W/B 1 W/H 1 FINAL O/K 7/29/6 347
|
PLM96-01883
| INSP - Plumbing Rough-in | 7/29/1996 | 7/29/1996 | 7/29/1996 12:00:00 AM | P | PASS |
|
|
DOWNSTAIRS BATHROOMS
|